SolarOperatingCAISO

Catalina Solar 2, LLC

Solar power plant in Kern County, California. 18 MW of nameplate capacity across 1 generator, operated by Onward Energy.

Also known as Catalina Solar Project (Phase 2) · EIA plant 59334

Analyst: free account, 1 question a day.

Willow Spring Solar, LLCTumbleweed Energy StorageRabbitbrush Solar, LLCSolar Star 2Rosamond South 1Catalina Solar 22 km
Open in the map
6 plants within 4.1 km, from EIA coordinates.

Key facts

Capacity
18 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2015First generator online
Operator
Onward EnergyEIA operator ID 60453
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Kern County, CA34.8122, −118.3528
EIA plant ID
59334EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Catalina Solar 2 produces

Free · EIA-923

Net generation, 2025

55.4 GWh

55,440 MWh, final

Capacity factor, 2025

35.2%

2024: 33.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

45.0–56.5

GWh a year. Low 2023, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
201523,722Not reported5 of 12
201656,51735.7%12 of 12
201755,39735.1%12 of 12
201856,02835.5%12 of 12
201952,43533.3%12 of 12
202048,17530.5%12 of 12
202148,20530.6%12 of 12
202246,78529.7%12 of 12
202344,99128.5%12 of 12
202452,78433.4%12 of 12
202555,44035.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
INV-1Solar Photovoltaic18.0August 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Onward Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Catalina Solar 2, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Catalina Solar 2

More plants operated by Onward Energy

Questions about Catalina Solar 2

How much power does Catalina Solar 2, LLC produce?

Catalina Solar 2, LLC reported 55,440 MWh (55.4 GWh) of net generation in 2025, a 35.2% capacity factor on 18 MW of nameplate capacity.

Where is Catalina Solar 2, LLC?

Catalina Solar 2, LLC is in Kern County, California, at 34.8122, −118.3528. It is in the California Independent System Operator balancing area (CISO).

Who operates Catalina Solar 2, LLC?

EIA-860M for August 2026 lists Onward Energy as the operator (EIA operator ID 60453). The operator is not always the owner.

When did Catalina Solar 2, LLC start operating?

Its first generator began operating in August 2015, according to EIA-860M.

Does InfraMap have power prices for Catalina Solar 2, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Catalina Solar 2, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page