SolarOperatingCAISO

Rudy Solar, LLC

Solar power plant in San Bernardino County, California. 1.5 MW of nameplate capacity across 1 generator, operated by CD US Solar PO 3, LLC.

Also known as EIA plant 59410

Analyst: free account, 1 question a day.

Alamo SolarHudson - High Desert HybridHigh Desert Power PlantRudy Solar10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
1.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2014First generator online
Operator
CD US Solar PO 3, LLCEIA operator ID 59185
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Bernardino County, CA34.7664, −117.3236
EIA plant ID
59410EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Rudy Solar produces

Free · EIA-923

Net generation, 2025

3.06 GWh

3,064 MWh, final

Capacity factor, 2025

23.3%

2024: 27.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.0–4.5

GWh a year. Low 2022, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014154Not reported1 of 12
20154,24632.3%12 of 12
20164,45633.8%12 of 12
20174,28732.6%12 of 12
20184,21032.0%12 of 12
20193,99630.4%12 of 12
20203,72328.3%12 of 12
20212,55519.4%12 of 12
20222,02115.4%12 of 12
20232,57619.6%12 of 12
20243,65227.7%12 of 12
20253,06423.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SNL19Solar Photovoltaic1.5December 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CD US Solar PO 3, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Rudy Solar, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Rudy Solar

More plants operated by CD US Solar PO 3, LLC

Questions about Rudy Solar

How much power does Rudy Solar, LLC produce?

Rudy Solar, LLC reported 3,064 MWh (3.06 GWh) of net generation in 2025, a 23.3% capacity factor on 1.5 MW of nameplate capacity.

Where is Rudy Solar, LLC?

Rudy Solar, LLC is in San Bernardino County, California, at 34.7664, −117.3236. It is in the California Independent System Operator balancing area (CISO).

Who operates Rudy Solar, LLC?

EIA-860M for August 2026 lists CD US Solar PO 3, LLC as the operator (EIA operator ID 59185). The operator is not always the owner.

When did Rudy Solar, LLC start operating?

Its first generator began operating in December 2014, according to EIA-860M.

Does InfraMap have power prices for Rudy Solar, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Rudy Solar, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page