Key facts
- Capacity
- 20 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- November 2015First generator online
- Operator
- AES Distributed EnergyEIA operator ID 61012
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 1 CAISO nodeResource nodes with prices
- Location
- Los Angeles County, CA34.7036, −118.3342
- EIA plant ID
- 59431EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Sierra Solar Greenworks produces
Free · EIA-923Net generation, 2025
41.2 GWh
41,194 MWh, final
Capacity factor, 2025
23.5%
2024: 22.5%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2016 to 2025
33.9–45.0
GWh a year. Low 2023, high 2018
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | 2,988 | Not reported | 2 of 12 |
| 2016 | 44,723 | 25.5% | 12 of 12 |
| 2017 | 44,033 | 25.1% | 12 of 12 |
| 2018 | 45,038 | 25.7% | 12 of 12 |
| 2019 | 42,635 | 24.3% | 12 of 12 |
| 2020 | 40,712 | 23.2% | 12 of 12 |
| 2021 | 38,425 | 21.9% | 12 of 12 |
| 2022 | 36,481 | 20.8% | 12 of 12 |
| 2023 | 33,921 | 19.4% | 12 of 12 |
| 2024 | 39,493 | 22.5% | 12 of 12 |
| 2025 | 41,194 | 23.5% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| SSG1 | Solar Photovoltaic | 20.0 | November 2015 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Distributed Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Sierra Solar Greenworks and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Sierra Solar Greenworks
More plants operated by AES Distributed Energy
Questions about Sierra Solar Greenworks
How much power does Sierra Solar Greenworks produce?
Sierra Solar Greenworks reported 41,194 MWh (41.2 GWh) of net generation in 2025, a 23.5% capacity factor on 20 MW of nameplate capacity.
Where is Sierra Solar Greenworks?
Sierra Solar Greenworks is in Los Angeles County, California, at 34.7036, −118.3342. It is in the California Independent System Operator balancing area (CISO).
Who operates Sierra Solar Greenworks?
EIA-860M for August 2026 lists AES Distributed Energy as the operator (EIA operator ID 61012). The operator is not always the owner.
When did Sierra Solar Greenworks start operating?
Its first generator began operating in November 2015, according to EIA-860M.
Does InfraMap have power prices for Sierra Solar Greenworks?
Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Sierra Solar Greenworks, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)