Springbok Solar Farm 2

Solar power plant in Kern County, California. 155 MW of nameplate capacity across 1 generator, operated by 63SU 8me, LLC.

Also known as EIA plant 59840

Analyst: free account, 1 question a day.

Springbok Solar Farm 1Beacon Solar Plant Site 2Eland Solar & Storage…Eland Solar & Storage…Hecate Energy Beacon Solar 1Springbok Solar Farm 22 km
Open in the map
6 plants within 4.0 km, from EIA coordinates.

Key facts

Capacity
155 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2016First generator online
Operator
63SU 8me, LLCEIA operator ID 59616
Grid
LDWPBalancing authority LDWP
Price nodes
None linkedNo verified ISO node
Location
Kern County, CA35.2500, −117.9768
EIA plant ID
59840EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Springbok Solar Farm 2 produces

Free · EIA-923

Net generation, 2025

397 GWh

397,111 MWh, final

Capacity factor, 2025

29.2%

2024: 29.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2017 to 2025

397.1–427.7

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201679,192Not reported4 of 12
2017417,61830.8%12 of 12
2018406,98630.0%12 of 12
2019408,66130.1%12 of 12
2020410,99930.2%12 of 12
2021415,52230.6%12 of 12
2022427,72331.5%12 of 12
2023404,16529.8%12 of 12
2024399,00529.3%12 of 12
2025397,11129.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SB2Solar Photovoltaic155.0September 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists 63SU 8me, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Springbok Solar Farm 2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Springbok Solar Farm 2

Questions about Springbok Solar Farm 2

How much power does Springbok Solar Farm 2 produce?

Springbok Solar Farm 2 reported 397,111 MWh (397 GWh) of net generation in 2025, a 29.2% capacity factor on 155 MW of nameplate capacity.

Where is Springbok Solar Farm 2?

Springbok Solar Farm 2 is in Kern County, California, at 35.2500, −117.9768. It is in the Los Angeles Department of Water and Power balancing area (LDWP).

Who operates Springbok Solar Farm 2?

EIA-860M for August 2026 lists 63SU 8me, LLC as the operator (EIA operator ID 59616). The operator is not always the owner.

When did Springbok Solar Farm 2 start operating?

Its first generator began operating in September 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page