SolarBattery storageOperatingFPL

Babcock Solar Energy Center Hybrid

Solar project in Charlotte County, Florida. 84.5 MW of nameplate capacity across 2 generators, operated by Florida Power & Light Co.

Also known as EIA plant 59993

This project groups Babcock Solar Energy Center Hybrid (EIA 59993). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Green PastureFort MyersPort Charlotte Energy LLCPrairie Creek FLHog BayBabcock Solar Energy…10 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
84.5 MWSolar 74.5 · Battery storage 10.0
Generators
2 operatingEIA-860M, August 2026
Operating since
December 2016First generator online
Operator
Florida Power & Light CoEIA operator ID 6452
Grid
FPLBalancing authority FPL
Price nodes
None linkedNo verified ISO node
Location
Charlotte County, FL26.8616, −81.7510
EIA plant ID
59993EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Babcock Solar Energy Center Hybrid produces

Free · EIA-923

Net generation, 2025

134 GWh

134,271 MWh, final

Capacity factor, 2025

20.7%

2024: 20.3%

January to July 2026

81.9 GWh

Provisional

Range, 2017 to 2025

131.8–164.1

GWh a year. Low 2024, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
20160Not reported1 of 12
2017164,07225.1%12 of 12
2018139,954Not reported10 of 12
2019159,52324.7%12 of 12
2020155,28024.0%12 of 12
2021156,55024.2%12 of 12
2022153,36523.8%12 of 12
2023146,02822.8%12 of 12
2024131,79520.3%12 of 12
2025134,27120.7%12 of 12
2026 (provisional, partial year)81,88621.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic74.5December 2016
BABatteries10.0March 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Florida Power & Light Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Babcock Solar Energy Center Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Babcock Solar Energy Center Hybrid

More plants operated by Florida Power & Light Co

Questions about Babcock Solar Energy Center Hybrid

How much power does Babcock Solar Energy Center Hybrid produce?

Babcock Solar Energy Center Hybrid reported 134,271 MWh (134 GWh) of net generation in 2025, a 20.7% capacity factor on 84.5 MW of nameplate capacity. From January to July 2026 it reported 81.9 GWh, which is provisional.

Where is Babcock Solar Energy Center Hybrid?

Babcock Solar Energy Center Hybrid is in Charlotte County, Florida, at 26.8616, −81.7510. It is in the Florida Power & Light Company balancing area (FPL).

Who operates Babcock Solar Energy Center Hybrid?

EIA-860M for August 2026 lists Florida Power & Light Co as the operator (EIA operator ID 6452). The operator is not always the owner.

When did Babcock Solar Energy Center Hybrid start operating?

Its first generator began operating in December 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page