SolarBattery storageOperatingERCOT

Castle Gap Solar Hybrid

Solar project in Upton County, Texas. 189.9 MW of nameplate capacity across 2 generators, operated by Upton County Solar 2 LLC.

Also known as Upton County Solar 2 · EIA plant 60123

This project groups Castle Gap Solar Hybrid (EIA 60123). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Upton County SolarRevolutionKing Mountain Wind Ranch 1Castle Gap Solar Hybrid2 km
Open in the map
5 plants within 5.9 km, from EIA coordinates.

Key facts

Capacity
189.9 MWSolar 180.0 · Battery storage 9.9
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2018First generator online
Operator
Upton County Solar 2 LLCEIA operator ID 61123
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Upton County, TX31.2550, −102.2720
EIA plant ID
60123EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Castle Gap Solar Hybrid produces

Free · EIA-923

Net generation, 2025

384 GWh

384,210 MWh, final

Capacity factor, 2025

24.4%

2024: 25.1%

January to July 2026

202 GWh

Provisional

Range, 2020 to 2025

384.2–451.2

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018300,19327.6%8 of 12
2019262,948Not reported7 of 12
2020408,14426.7%12 of 12
2021427,58828.0%12 of 12
2022451,16829.1%12 of 12
2023396,24625.2%12 of 12
2024396,13525.1%12 of 12
2025384,21024.4%12 of 12
2026 (provisional, partial year)201,98522.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BAT1Batteries9.9June 2019
CGAPSolar Photovoltaic180.0May 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Upton County Solar 2 LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Castle Gap Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Castle Gap Solar Hybrid

Questions about Castle Gap Solar Hybrid

How much power does Castle Gap Solar Hybrid produce?

Castle Gap Solar Hybrid reported 384,210 MWh (384 GWh) of net generation in 2025, a 24.4% capacity factor on 189.9 MW of nameplate capacity. From January to July 2026 it reported 202 GWh, which is provisional.

Where is Castle Gap Solar Hybrid?

Castle Gap Solar Hybrid is in Upton County, Texas, at 31.2550, −102.2720. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Castle Gap Solar Hybrid?

EIA-860M for August 2026 lists Upton County Solar 2 LLC as the operator (EIA operator ID 61123). The operator is not always the owner.

When did Castle Gap Solar Hybrid start operating?

Its first generator began operating in May 2018, according to EIA-860M.

Does InfraMap have power prices for Castle Gap Solar Hybrid?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Castle Gap Solar Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page