Weymouth Solar Plant
Solar power plant in Los Angeles County, California. 3 MW of nameplate capacity across 2 generators, operated by Metropolitan Water District of S CA.
Also known as EIA plant 60255
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 3 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 2016First generator online
- Operator
- Metropolitan Water District of S CAEIA operator ID 12397
- Grid
- CAISOBalancing authority CISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Los Angeles County, CA34.1086, −117.7822
- EIA plant ID
- 60255EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Weymouth Solar Plant produces
Free · EIA-923Net generation, 2025
3.28 GWh
3,277 MWh, final
Capacity factor, 2025
12.5%
2024: 18.3%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2017 to 2025
3.3–6.1
GWh a year. Low 2025, high 2017
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | 2,832 | Not reported | 7 of 12 |
| 2017 | 6,095 | 23.2% | 12 of 12 |
| 2018 | 5,700 | 21.7% | 12 of 12 |
| 2019 | 4,987 | 19.0% | 12 of 12 |
| 2020 | 5,005 | 19.0% | 12 of 12 |
| 2021 | 5,278 | 20.1% | 12 of 12 |
| 2022 | 5,952 | 22.6% | 12 of 12 |
| 2023 | 4,970 | 18.9% | 12 of 12 |
| 2024 | 4,832 | 18.3% | 12 of 12 |
| 2025 | 3,277 | 12.5% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Solar Photovoltaic | 2.0 | June 2016 |
| 2 | Solar Photovoltaic | 1.0 | June 2016 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Metropolitan Water District of S CA as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Weymouth Solar Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Weymouth Solar Plant
More plants operated by Metropolitan Water District of S CA
Questions about Weymouth Solar Plant
How much power does Weymouth Solar Plant produce?
Weymouth Solar Plant reported 3,277 MWh (3.28 GWh) of net generation in 2025, a 12.5% capacity factor on 3 MW of nameplate capacity.
Where is Weymouth Solar Plant?
Weymouth Solar Plant is in Los Angeles County, California, at 34.1086, −117.7822. It is in the California Independent System Operator balancing area (CISO).
Who operates Weymouth Solar Plant?
EIA-860M for August 2026 lists Metropolitan Water District of S CA as the operator (EIA operator ID 12397). The operator is not always the owner.
When did Weymouth Solar Plant start operating?
Its first generator began operating in June 2016, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page