SolarOperatingLDWP

RE Barren Ridge 1

Solar power plant in Kern County, California. 60 MW of nameplate capacity across 1 generator, operated by RE Barren Ridge 1, LLC.

Also known as EIA plant 60389

Analyst: free account, 1 question a day.

Beacon Solar Plant Site 5Springbok 3 Solar Farm HybridHecate Energy Beacon…Eland Solar & Storage Center, Phase 2 HyEland Solar & Storage Center, Phase 1 HyRE Barren Ridge 15 km
Open in the map
6 plants within 8.6 km, from EIA coordinates.

Key facts

Capacity
60 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2016First generator online
Operator
RE Barren Ridge 1, LLCEIA operator ID 60191
Grid
LDWPBalancing authority LDWP
Price nodes
None linkedNo verified ISO node
Location
Kern County, CA35.2047, −118.0688
EIA plant ID
60389EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power RE Barren Ridge 1 produces

Free · EIA-923

Net generation, 2025

164 GWh

164,367 MWh, final

Capacity factor, 2025

31.3%

2024: 33.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2017 to 2025

163.4–178.0

GWh a year. Low 2019, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201692,126Not reported9 of 12
2017177,96933.9%12 of 12
2018177,06133.7%12 of 12
2019163,38831.1%12 of 12
2020168,61332.0%12 of 12
2021171,28532.6%12 of 12
2022169,34632.2%12 of 12
2023169,49532.2%12 of 12
2024174,98533.2%12 of 12
2025164,36731.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
REBR1Solar Photovoltaic60.0August 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RE Barren Ridge 1, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query RE Barren Ridge 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near RE Barren Ridge 1

Questions about RE Barren Ridge 1

How much power does RE Barren Ridge 1 produce?

RE Barren Ridge 1 reported 164,367 MWh (164 GWh) of net generation in 2025, a 31.3% capacity factor on 60 MW of nameplate capacity.

Where is RE Barren Ridge 1?

RE Barren Ridge 1 is in Kern County, California, at 35.2047, −118.0688. It is in the Los Angeles Department of Water and Power balancing area (LDWP).

Who operates RE Barren Ridge 1?

EIA-860M for August 2026 lists RE Barren Ridge 1, LLC as the operator (EIA operator ID 60191). The operator is not always the owner.

When did RE Barren Ridge 1 start operating?

Its first generator began operating in August 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page