SolarBattery storageOperatingLDWP

Springbok 3 Solar Farm Hybrid

Solar project in Kern County, California. 91.5 MW of nameplate capacity across 2 generators, operated by 64KT 8me LLC.

Also known as EIA plant 60491

This project groups Springbok 3 Solar Farm Hybrid (EIA 60491). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

California CityCalCity Solar 1Eland Solar & Storage…Eland Solar & Storage…RE Barren Ridge 1Springbok Solar Farm 2Springbok 3 Solar Far…2 km
Open in the map
6 plants within 9.1 km, from EIA coordinates.

Key facts

Capacity
91.5 MWSolar 90.0 · Battery storage 1.5
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2019First generator online
Operator
64KT 8me LLCEIA operator ID 60278
Grid
LDWPBalancing authority LDWP
Price nodes
None linkedNo verified ISO node
Location
Kern County, CA35.1712, −118.0017
EIA plant ID
60491EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Springbok 3 Solar Farm Hybrid produces

Free · EIA-923

Net generation, 2025

251 GWh

251,125 MWh, final

Capacity factor, 2025

31.9%

2024: 31.2%

January to July 2026

138 GWh

Provisional

Range, 2020 to 2025

233.9–251.1

GWh a year. Low 2023, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019112,586Not reported6 of 12
2020242,55430.7%12 of 12
2021238,73130.3%12 of 12
2022234,21329.7%12 of 12
2023233,92629.7%12 of 12
2024246,67531.2%12 of 12
2025251,12531.9%12 of 12
2026 (provisional, partial year)137,81430.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SB3BSBatteries1.5July 2019
SB3SFSolar Photovoltaic90.0July 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists 64KT 8me LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Springbok 3 Solar Farm Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Springbok 3 Solar Farm Hybrid

Questions about Springbok 3 Solar Farm Hybrid

How much power does Springbok 3 Solar Farm Hybrid produce?

Springbok 3 Solar Farm Hybrid reported 251,125 MWh (251 GWh) of net generation in 2025, a 31.9% capacity factor on 91.5 MW of nameplate capacity. From January to July 2026 it reported 138 GWh, which is provisional.

Where is Springbok 3 Solar Farm Hybrid?

Springbok 3 Solar Farm Hybrid is in Kern County, California, at 35.1712, −118.0017. It is in the Los Angeles Department of Water and Power balancing area (LDWP).

Who operates Springbok 3 Solar Farm Hybrid?

EIA-860M for August 2026 lists 64KT 8me LLC as the operator (EIA operator ID 60278). The operator is not always the owner.

When did Springbok 3 Solar Farm Hybrid start operating?

Its first generator began operating in July 2019, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page