SolarOperatingISO-NE

158th Fighter Wing Solar Farm

Solar power plant in Chittenden County, Vermont. 1.3 MW of nameplate capacity across 1 generator, operated by 158th Fighter Wing.

Also known as EIA plant 60542

Analyst: free account, 1 question a day.

Whitcomb Solar FarmGorge 18Essex Junction 19158th Fighter Wing So…1 km
Open in the map
5 plants within 3.0 km, from EIA coordinates.

Key facts

Capacity
1.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2011First generator online
Operator
158th Fighter WingEIA operator ID 60301
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
Chittenden County, VT44.4777, −73.1534
EIA plant ID
60542EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power 158th Fighter Wing Solar Farm produces

Free · EIA-923

Net generation, 2025

1.47 GWh

1,468 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

0.9–1.7

GWh a year. Low 2021, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
20161,65512.6%12 of 12
20171,616Not reported12 of 12
20181,40912.4%12 of 12
20191,52013.3%12 of 12
20201,29211.3%12 of 12
20218827.7%12 of 12
2022Not reportedNot reported0 of 12
20231,27711.2%12 of 12
2024Not reportedNot reported0 of 12
20251,468Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
900Solar Photovoltaic1.3September 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists 158th Fighter Wing as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query 158th Fighter Wing Solar Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near 158th Fighter Wing Solar Farm

Questions about 158th Fighter Wing Solar Farm

How much power does 158th Fighter Wing Solar Farm produce?

158th Fighter Wing Solar Farm reported 1,468 MWh (1.47 GWh) of net generation in 2025.

Where is 158th Fighter Wing Solar Farm?

158th Fighter Wing Solar Farm is in Chittenden County, Vermont, at 44.4777, −73.1534. It is in the ISO New England Inc. balancing area (ISNE).

Who operates 158th Fighter Wing Solar Farm?

EIA-860M for August 2026 lists 158th Fighter Wing as the operator (EIA operator ID 60301). The operator is not always the owner.

When did 158th Fighter Wing Solar Farm start operating?

Its first generator began operating in September 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page