Natural gasOperatingMISO

Montgomery County

Natural gas power plant in Montgomery County, Texas. 1,000 MW of nameplate capacity across 3 generators, operated by Entergy Texas Inc..

Also known as Montgomery County Power Plant · EIA plant 60925

Analyst: free account, 1 question a day.

WAL3390HEB00767HEB00594WAL602WAL5287Montgomery County20 km
Open in the map
6 plants within 40 km, from EIA coordinates.

Key facts

Capacity
1,000 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
January 2021First generator online
Operator
Entergy Texas Inc.EIA operator ID 55937
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Montgomery County, TX30.4408, −95.5275
EIA plant ID
60925EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Montgomery County produces

Free · EIA-923

Net generation, 2025

5.87 TWh

5,870,260 MWh, final. 11 of 12 months reported

Capacity factor, 2025

73.0%

2024: 67.5%

January to July 2026

4.11 TWh

Provisional

Range, 2021 to 2024

5.2–6.0

TWh a year. Low 2021, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
20215,203,084Not reported12 of 12
20225,985,48768.3%12 of 12
20235,744,48265.6%12 of 12
20245,929,30867.5%12 of 12
20255,870,26073.0%11 of 12
2026 (provisional, partial year)4,109,08580.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

2.87M

US short tons. 2024: 2.63M

SO₂, 2025

15

US short tons

NOx, 2025

149

US short tons

2 of 2 EPA units reported CO₂ in 2025 (CT1, CT2), matched to EIA plant 60925 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Lewis Creek Lake

Watershed stress

Moderate · 0.436

USGS SUI, HUC12 Little Lake Creek-Lake Conroe

0 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1ANatural Gas Fired Combined Cycle250.0January 2021
1BNatural Gas Fired Combined Cycle250.0January 2021
1CNatural Gas Fired Combined Cycle500.0January 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Entergy Texas Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Montgomery County and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Montgomery County

More plants operated by Entergy Texas Inc.

Questions about Montgomery County

How much power does Montgomery County produce?

Montgomery County reported 5,870,260 MWh (5.87 TWh) of net generation in 2025, a 73.0% capacity factor on 1,000 MW of nameplate capacity. From January to July 2026 it reported 4.11 TWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Montgomery County?

Montgomery County is in Montgomery County, Texas, at 30.4408, −95.5275. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Montgomery County?

EIA-860M for August 2026 lists Entergy Texas Inc. as the operator (EIA operator ID 55937). The operator is not always the owner.

When did Montgomery County start operating?

Its first generator began operating in January 2021, according to EIA-860M.

Does InfraMap have power prices for Montgomery County?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Montgomery County, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page