Natural gasOperatingMISO

Hardin County Peaking Facility

Natural gas power plant in Hardin County, Texas. 173 MW of nameplate capacity across 2 generators, operated by Entergy Texas Inc..

Also known as Hardin County Peaking Power Facility · EIA plant 56604

Analyst: free account, 1 question a day.

HEB00048ExxonMobil Beaumont RefineryChickadee G-3SabineJCO Oxides Olefins Pl…Hardin County Peaking…25 km
Open in the map
6 plants within 49 km, from EIA coordinates.

Key facts

Capacity
173 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
Entergy Texas Inc.EIA operator ID 55937
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Hardin County, TX30.3038, −94.2526
EIA plant ID
56604EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hardin County Peaking Facility produces

Free · EIA-923

Net generation, 2025

257 GWh

256,789 MWh, final

Capacity factor, 2025

16.9%

2024: 12.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

16.8–256.8

GWh a year. Low 2021, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
201056,2763.7%12 of 12
2011102,2036.7%12 of 12
2012115,1097.6%12 of 12
201360,5464.0%12 of 12
2014152,56210.1%12 of 12
2015105,8427.0%12 of 12
201653,3173.5%12 of 12
201770,9224.7%12 of 12
201845,9423.0%12 of 12
201938,8412.6%12 of 12
202091,2986.0%12 of 12
202116,8371.1%12 of 12
2022124,0558.2%12 of 12
2023128,0738.5%12 of 12
2024194,64612.8%12 of 12
2025256,78916.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

188,567

US short tons. 2024: 142,903

SO₂, 2025

1

US short tons

NOx, 2025

48

US short tons

CO₂ per MWh, calculated

0.73 t

About 1,469 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (HCCT1, HCCT2), matched to EIA plant 56604 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HC1Natural Gas Fired Combustion Turbine86.5July 2001
HC2Natural Gas Fired Combustion Turbine86.5July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Entergy Texas Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hardin County Peaking Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hardin County Peaking Facility

More plants operated by Entergy Texas Inc.

Questions about Hardin County Peaking Facility

How much power does Hardin County Peaking Facility produce?

Hardin County Peaking Facility reported 256,789 MWh (257 GWh) of net generation in 2025, a 16.9% capacity factor on 173 MW of nameplate capacity.

Where is Hardin County Peaking Facility?

Hardin County Peaking Facility is in Hardin County, Texas, at 30.3038, −94.2526. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Hardin County Peaking Facility?

EIA-860M for August 2026 lists Entergy Texas Inc. as the operator (EIA operator ID 55937). The operator is not always the owner.

When did Hardin County Peaking Facility start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Does InfraMap have power prices for Hardin County Peaking Facility?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Hardin County Peaking Facility, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page