Natural gasOperatingMISO

ERDC

Natural gas power plant in Warren County, Mississippi. 3.2 MW of nameplate capacity across 8 generators, operated by Entergy Texas Inc..

Also known as EIA plant 66592

Analyst: free account, 1 question a day.

Ergon Refining VicksburgInternational Paper Vicksburg MillGrand GulfERDC20 km
Open in the map
3 plants within 38 km, from EIA coordinates.

Key facts

Capacity
3.2 MWNameplate
Generators
8 operatingEIA-860M, August 2026
Operating since
October 2021First generator online
Operator
Entergy Texas Inc.EIA operator ID 55937
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Warren County, MS32.3103, −90.8599
EIA plant ID
66592EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power ERDC produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 0.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2022 to 2025

0.0–2.0

MWh a year. Low 2023, high 2022

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
202220.0%12 of 12
202300.0%12 of 12
202400.0%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ERDC1Natural Gas Internal Combustion Engine0.4October 2021
ERDC2Natural Gas Internal Combustion Engine0.4October 2021
ERDC3Natural Gas Internal Combustion Engine0.4October 2021
ERDC4Natural Gas Internal Combustion Engine0.4October 2021
ERDC5Natural Gas Internal Combustion Engine0.4October 2021
ERDC6Natural Gas Internal Combustion Engine0.4October 2021
ERDC7Natural Gas Internal Combustion Engine0.4October 2021
ERDC8Natural Gas Internal Combustion Engine0.4October 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Entergy Texas Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query ERDC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near ERDC

More plants operated by Entergy Texas Inc.

Questions about ERDC

How much power does ERDC produce?

ERDC reported 0 MWh (0 MWh) of net generation in 2025.

Where is ERDC?

ERDC is in Warren County, Mississippi, at 32.3103, −90.8599. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates ERDC?

EIA-860M for August 2026 lists Entergy Texas Inc. as the operator (EIA operator ID 55937). The operator is not always the owner.

When did ERDC start operating?

Its first generator began operating in October 2021, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page