SolarOperatingPACE

Sweetwater Solar

Solar power plant in Sweetwater County, Wyoming. 92 MW of nameplate capacity across 1 generator, operated by Onward Energy.

Also known as EIA plant 61369

Analyst: free account, 1 question a day.

WE Soda Alkalai LLCShute Creek FacilitySimplot PhosphatesFontenelleSweetwater Solar25 km
Open in the map
5 plants within 54 km, from EIA coordinates.

Key facts

Capacity
92 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2018First generator online
Operator
Onward EnergyEIA operator ID 60453
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Sweetwater County, WY41.6291, −109.6835
EIA plant ID
61369EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sweetwater Solar produces

Free · EIA-923

Net generation, 2025

173 GWh

173,282 MWh, final

Capacity factor, 2025

21.5%

2024: 22.4%

January to July 2026

113 GWh

Provisional

Range, 2019 to 2025

165.4–185.9

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018824Not reported1 of 12
2019180,13822.4%12 of 12
2020165,36420.5%12 of 12
2021179,07222.2%12 of 12
2022185,90923.1%12 of 12
2023173,68921.6%12 of 12
2024180,89022.4%12 of 12
2025173,28221.5%12 of 12
2026 (provisional, partial year)113,32224.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PV1Solar Photovoltaic92.0December 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Onward Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sweetwater Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sweetwater Solar

More plants operated by Onward Energy

Questions about Sweetwater Solar

How much power does Sweetwater Solar produce?

Sweetwater Solar reported 173,282 MWh (173 GWh) of net generation in 2025, a 21.5% capacity factor on 92 MW of nameplate capacity. From January to July 2026 it reported 113 GWh, which is provisional.

Where is Sweetwater Solar?

Sweetwater Solar is in Sweetwater County, Wyoming, at 41.6291, −109.6835. It is in the PacifiCorp - East balancing area (PACE).

Who operates Sweetwater Solar?

EIA-860M for August 2026 lists Onward Energy as the operator (EIA operator ID 60453). The operator is not always the owner.

When did Sweetwater Solar start operating?

Its first generator began operating in December 2018, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page