Key facts

Capacity
55.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
March 2019First generator online
Operator
Tampa Electric CoEIA operator ID 18454
Grid
TECBalancing authority TEC
Price nodes
None linkedNo verified ISO node
Location
Polk County, FL27.9133, −81.8101
EIA plant ID
61666EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Peace Creek Solar produces

Free · EIA-923

Net generation, 2025

96.7 GWh

96,737 MWh, final

Capacity factor, 2025

19.9%

2024: 18.5%

January to July 2026

59.7 GWh

Provisional

Range, 2020 to 2025

90.1–111.0

GWh a year. Low 2024, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
201987,980Not reported10 of 12
2020103,55521.3%12 of 12
2021110,97522.9%12 of 12
202299,65720.5%12 of 12
202391,36018.8%12 of 12
202490,14518.5%12 of 12
202596,73719.9%12 of 12
2026 (provisional, partial year)59,67921.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GENSolar Photovoltaic55.4March 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tampa Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Peace Creek Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Peace Creek Solar

More plants operated by Tampa Electric Co

Questions about Peace Creek Solar

How much power does Peace Creek Solar produce?

Peace Creek Solar reported 96,737 MWh (96.7 GWh) of net generation in 2025, a 19.9% capacity factor on 55.4 MW of nameplate capacity. From January to July 2026 it reported 59.7 GWh, which is provisional.

Where is Peace Creek Solar?

Peace Creek Solar is in Polk County, Florida, at 27.9133, −81.8101. It is in the Tampa Electric Company balancing area (TEC).

Who operates Peace Creek Solar?

EIA-860M for August 2026 lists Tampa Electric Co as the operator (EIA operator ID 18454). The operator is not always the owner.

When did Peace Creek Solar start operating?

Its first generator began operating in March 2019, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location