Nautilus Lindstrom Solar (CSG)
Solar power plant in Chisago County, Minnesota. 2 MW of nameplate capacity across 1 generator, operated by Nautilus Solar Solutions.
Also known as EIA plant 62030
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 2 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- March 2019First generator online
- Operator
- Nautilus Solar SolutionsEIA operator ID 61227
- Grid
- MISOBalancing authority MISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Chisago County, MN45.3361, −92.8140
- EIA plant ID
- 62030EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Nautilus Lindstrom Solar (CSG) produces
Free · EIA-923Net generation, 2025
3.39 GWh
3,389 MWh, final
Capacity factor, 2025
19.3%
2024: 20.1%
January to July 2026
2.31 GWh
Provisional
Range, 2020 to 2025
3.3–3.6
GWh a year. Low 2022, high 2021
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | 2,586 | Not reported | 10 of 12 |
| 2020 | 3,442 | 19.6% | 12 of 12 |
| 2021 | 3,582 | 20.4% | 12 of 12 |
| 2022 | 3,317 | 18.9% | 12 of 12 |
| 2023 | 3,532 | 20.2% | 12 of 12 |
| 2024 | 3,530 | 20.1% | 12 of 12 |
| 2025 | 3,389 | 19.3% | 12 of 12 |
| 2026 (provisional, partial year) | 2,314 | 22.7% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| LI | Solar Photovoltaic | 2.0 | March 2019 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nautilus Solar Solutions as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Nautilus Lindstrom Solar (CSG) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Nautilus Lindstrom Solar (CSG)
More plants operated by Nautilus Solar Solutions
Questions about Nautilus Lindstrom Solar (CSG)
How much power does Nautilus Lindstrom Solar (CSG) produce?
Nautilus Lindstrom Solar (CSG) reported 3,389 MWh (3.39 GWh) of net generation in 2025, a 19.3% capacity factor on 2 MW of nameplate capacity. From January to July 2026 it reported 2.31 GWh, which is provisional.
Where is Nautilus Lindstrom Solar (CSG)?
Nautilus Lindstrom Solar (CSG) is in Chisago County, Minnesota, at 45.3361, −92.8140. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Nautilus Lindstrom Solar (CSG)?
EIA-860M for August 2026 lists Nautilus Solar Solutions as the operator (EIA operator ID 61227). The operator is not always the owner.
When did Nautilus Lindstrom Solar (CSG) start operating?
Its first generator began operating in March 2019, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page