SolarOperatingISO-NE

Barre Solar III LLC

Solar power plant in Worcester County, Massachusetts. 1 MW of nameplate capacity across 1 generator, operated by AES Distributed Energy.

Also known as Barre Solar III · Barre Solar III, LLC · EIA plant 62363

Analyst: free account, 1 question a day.

Stetson Road Solar - Barre IBarre II Solar ProjectWilliamsville Hybrid CSGKS Solar Six LLCGolden Hills SolarRGS-Rutland VNM SREC…Barre Solar III5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
1 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
March 2018First generator online
Operator
AES Distributed EnergyEIA operator ID 61012
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
Worcester County, MA42.4193, −72.1139
EIA plant ID
62363EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Barre Solar III produces

Free · EIA-923

Net generation, 2025

1.38 GWh

1,381 MWh, final

Capacity factor, 2025

15.8%

2024: 16.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2019 to 2025

1.4–1.7

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
20181,305Not reported10 of 12
20191,52217.4%12 of 12
20201,61118.3%12 of 12
20211,48817.0%12 of 12
20221,68019.2%12 of 12
20231,47816.9%12 of 12
20241,46516.7%12 of 12
20251,38115.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BSPVSolar Photovoltaic1.0March 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Distributed Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Barre Solar III LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Barre Solar III

More plants operated by AES Distributed Energy

Questions about Barre Solar III

How much power does Barre Solar III LLC produce?

Barre Solar III LLC reported 1,381 MWh (1.38 GWh) of net generation in 2025, a 15.8% capacity factor on 1 MW of nameplate capacity.

Where is Barre Solar III LLC?

Barre Solar III LLC is in Worcester County, Massachusetts, at 42.4193, −72.1139. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Barre Solar III LLC?

EIA-860M for August 2026 lists AES Distributed Energy as the operator (EIA operator ID 61012). The operator is not always the owner.

When did Barre Solar III LLC start operating?

Its first generator began operating in March 2018, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page