Key facts
- Capacity
- 99 MWSolar 49.5 · Battery storage 49.5
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 2020First generator online
- Operator
- Georgia Power CoEIA operator ID 7140
- Grid
- SOCOBalancing authority SOCO
- Price nodes
- None linkedNo verified ISO node
- Location
- Lowndes County, GA30.9574, −83.2229
- EIA plant ID
- 62377EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Moody Air Force Base Solar produces
Free · EIA-923Net generation, 2025
84.2 GWh
84,201 MWh, final
Capacity factor, 2025
19.4%
2024: 15.6%
January to July 2026
35.0 GWh
Provisional. 4 of 7 months reported
Range, 2021 to 2025
68.0–98.8
GWh a year. Low 2024, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 53,239 | 21.0% | 7 of 12 |
| 2021 | 94,561 | 21.8% | 12 of 12 |
| 2022 | 98,807 | 22.8% | 12 of 12 |
| 2023 | 93,957 | 21.7% | 12 of 12 |
| 2024 | 67,983 | 15.6% | 12 of 12 |
| 2025 | 84,201 | 19.4% | 12 of 12 |
| 2026 (provisional, partial year) | 34,996 | Not reported | 4 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Solar Photovoltaic | 49.5 | June 2020 |
| 2 | Batteries | 49.5 | April 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Georgia Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Moody Air Force Base Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Moody Air Force Base Solar
More plants operated by Georgia Power Co
Questions about Moody Air Force Base Solar
How much power does Moody Air Force Base Solar produce?
Moody Air Force Base Solar reported 84,201 MWh (84.2 GWh) of net generation in 2025, a 19.4% capacity factor on 99 MW of nameplate capacity. From January to July 2026 it reported 35.0 GWh, which is provisional.
Where is Moody Air Force Base Solar?
Moody Air Force Base Solar is in Lowndes County, Georgia, at 30.9574, −83.2229. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).
Who operates Moody Air Force Base Solar?
EIA-860M for August 2026 lists Georgia Power Co as the operator (EIA operator ID 7140). The operator is not always the owner.
Is Moody Air Force Base Solar a solar or a battery storage plant?
Both. Solar capacity totals 49.5 MW and battery storage capacity totals 49.5 MW.
When did Moody Air Force Base Solar start operating?
Its first generator began operating in June 2020, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page