Natural gasOperatingSOCO

McIntosh Combined Cycle Facility

Natural gas power plant in Effingham County, Georgia. 1,376.6 MW of nameplate capacity across 6 generators, operated by Georgia Power Co.

Also known as EIA plant 56150

Analyst: free account, 1 question a day.

Savannah River MillJasperRincon Solar IBobby C Smith Jr Energy FacilityMcIntosh Combined Cyc…5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
1,376.6 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
June 2005First generator online
Operator
Georgia Power CoEIA operator ID 7140
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Effingham County, GA32.3478, −81.1817
EIA plant ID
56150EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McIntosh Combined Cycle Facility produces

Free · EIA-923

Net generation, 2025

7.86 TWh

7,857,050 MWh, final

Capacity factor, 2025

65.2%

2024: 66.4%

January to July 2026

4.43 TWh

Provisional

Range, 2016 to 2025

7.9–9.1

TWh a year. Low 2025, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
20052,554,482Not reported12 of 12
20065,081,201Not reported12 of 12
20075,523,509Not reported12 of 12
20081,823,221Not reported6 of 12
2009358,066Not reported1 of 12
20107,699,40463.8%12 of 12
20118,163,83167.7%12 of 12
20127,534,02162.3%12 of 12
20135,699,04762.7%9 of 12
20147,328,12560.8%12 of 12
20157,595,53468.8%11 of 12
20168,799,23272.8%12 of 12
20178,930,97474.1%12 of 12
20189,053,31375.1%12 of 12
20198,434,78269.9%12 of 12
20208,621,41571.3%12 of 12
20218,586,54371.2%12 of 12
20228,637,47571.6%12 of 12
20239,107,24075.5%12 of 12
20248,034,74166.4%12 of 12
20257,857,05065.2%12 of 12
2026 (provisional, partial year)4,432,30363.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

3.32M

US short tons. 2024: 3.39M

SO₂, 2025

17

US short tons

NOx, 2025

183

US short tons

CO₂ per MWh, calculated

0.42 t

About 845 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (10A, 10B, 11A, 11B), matched to EIA plant 56150 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,565

million gallons

Consumption, 2024

1,398

million gallons

Source

McIntosh steam unit

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.152

USGS SUI, HUC12 Dasher Creek-Savannah River

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
10STNatural Gas Fired Combined Cycle281.9June 2005
11STNatural Gas Fired Combined Cycle281.9June 2005
C10ANatural Gas Fired Combined Cycle203.2June 2005
C10BNatural Gas Fired Combined Cycle203.2June 2005
C11ANatural Gas Fired Combined Cycle203.2June 2005
C11BNatural Gas Fired Combined Cycle203.2June 2005

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Georgia Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McIntosh Combined Cycle Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McIntosh Combined Cycle Facility

More plants operated by Georgia Power Co

Questions about McIntosh Combined Cycle Facility

How much power does McIntosh Combined Cycle Facility produce?

McIntosh Combined Cycle Facility reported 7,857,050 MWh (7.86 TWh) of net generation in 2025, a 65.2% capacity factor on 1,376.6 MW of nameplate capacity. From January to July 2026 it reported 4.43 TWh, which is provisional.

Where is McIntosh Combined Cycle Facility?

McIntosh Combined Cycle Facility is in Effingham County, Georgia, at 32.3478, −81.1817. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates McIntosh Combined Cycle Facility?

EIA-860M for August 2026 lists Georgia Power Co as the operator (EIA operator ID 7140). The operator is not always the owner.

When did McIntosh Combined Cycle Facility start operating?

Its first generator began operating in June 2005, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page