Natural gasOperatingSOCO

McIntosh

Natural gas power plant in Effingham County, Georgia. 810.4 MW of nameplate capacity across 8 generators, operated by Georgia Power Co.

Also known as Plant McIntosh · McIntosh Power Station · EIA plant 6124

Analyst: free account, 1 question a day.

McIntosh Combined Cyc…JasperSavannah River MillRincon Solar IBobby C Smith Jr Energy Facility5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
810.4 MWNameplate
Generators
8 operatingEIA-860M, August 2026
Operating since
February 1994First generator online
Operator
Georgia Power CoEIA operator ID 7140
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Effingham County, GA32.3563, −81.1684
EIA plant ID
6124EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McIntosh produces

Free · EIA-923

Net generation, 2025

35.5 GWh

35,533 MWh, final

Capacity factor, 2025

0.5%

2024: 0.4%

January to July 2026

36.7 GWh

Provisional

Range, 2021 to 2025

18.2–84.3

GWh a year. Low 2023, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,304,634Not reported12 of 12
20011,030,791Not reported12 of 12
20021,175,218Not reported12 of 12
20031,079,422Not reported12 of 12
20041,071,718Not reported12 of 12
2005975,841Not reported12 of 12
2006990,090Not reported12 of 12
2007737,494Not reported12 of 12
2008706,633Not reported12 of 12
200930,953Not reported12 of 12
2010270,4383.1%12 of 12
201165,8920.8%12 of 12
20126,5330.1%12 of 12
2013Not reportedNot reported0 of 12
2014308,732Not reported12 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202021,9480.5%7 of 12
202127,2480.4%12 of 12
202284,292Not reported12 of 12
202318,174Not reported12 of 12
202432,0090.4%12 of 12
202535,5330.5%12 of 12
2026 (provisional, partial year)36,7070.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

37,621

US short tons. 2024: 33,903

SO₂, 2025

4

US short tons

NOx, 2025

53

US short tons

CO₂ per MWh, calculated

1.06 t

About 2,118 lb per MWh

8 of 8 EPA units reported CO₂ in 2025 (1, CT1, CT2, CT3, CT4, CT5, CT6, CT7, and others), matched to EIA plant 6124 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combustion Turbine101.3May 1995
CT2Natural Gas Fired Combustion Turbine101.3April 1995
CT3Natural Gas Fired Combustion Turbine101.3June 1994
CT4Natural Gas Fired Combustion Turbine101.3May 1994
CT5Natural Gas Fired Combustion Turbine101.3April 1994
CT6Natural Gas Fired Combustion Turbine101.3May 1994
CT7Natural Gas Fired Combustion Turbine101.3April 1994
CT8Natural Gas Fired Combustion Turbine101.3February 1994

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Georgia Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McIntosh and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McIntosh

More plants operated by Georgia Power Co

Questions about McIntosh

How much power does McIntosh produce?

McIntosh reported 35,533 MWh (35.5 GWh) of net generation in 2025, a 0.5% capacity factor on 810.4 MW of nameplate capacity. From January to July 2026 it reported 36.7 GWh, which is provisional.

Where is McIntosh?

McIntosh is in Effingham County, Georgia, at 32.3563, −81.1684. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates McIntosh?

EIA-860M for August 2026 lists Georgia Power Co as the operator (EIA operator ID 7140). The operator is not always the owner.

When did McIntosh start operating?

Its first generator began operating in February 1994, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page