WindOperatingMISO

High Prairie Wind Farm

Wind power plant in Schuyler County, Missouri. 400 MW of nameplate capacity across 1 generator, operated by Union Electric Co - (MO).

Also known as High Prairie · EIA plant 62563

Analyst: free account, 1 question a day.

Morris SolarMemphisBloomfield Municipal…La PlataUnionville City ofHigh Prairie Wind Farm25 km
Open in the map
6 plants within 43 km, from EIA coordinates.

Key facts

Capacity
400 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2020First generator online
Operator
Union Electric Co - (MO)EIA operator ID 19436
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Schuyler County, MO40.3982, −92.5186
EIA plant ID
62563EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power High Prairie Wind Farm produces

Free · EIA-923

Net generation, 2025

466 GWh

465,769 MWh, final

Capacity factor, 2025

13.3%

2024: 18.5%

January to July 2026

569 GWh

Provisional

Range, 2021 to 2025

465.8–937.1

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202060,083Not reported1 of 12
2021801,24422.9%12 of 12
2022937,05126.7%12 of 12
2023875,41025.0%12 of 12
2024648,68118.5%12 of 12
2025465,76913.3%12 of 12
2026 (provisional, partial year)569,38828.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HPWFOnshore Wind Turbine400.0December 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Union Electric Co - (MO) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query High Prairie Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near High Prairie Wind Farm

More plants operated by Union Electric Co - (MO)

Questions about High Prairie Wind Farm

How much power does High Prairie Wind Farm produce?

High Prairie Wind Farm reported 465,769 MWh (466 GWh) of net generation in 2025, a 13.3% capacity factor on 400 MW of nameplate capacity. From January to July 2026 it reported 569 GWh, which is provisional.

Where is High Prairie Wind Farm?

High Prairie Wind Farm is in Schuyler County, Missouri, at 40.3982, −92.5186. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates High Prairie Wind Farm?

EIA-860M for August 2026 lists Union Electric Co - (MO) as the operator (EIA operator ID 19436). The operator is not always the owner.

When did High Prairie Wind Farm start operating?

Its first generator began operating in December 2020, according to EIA-860M.

Does InfraMap have power prices for High Prairie Wind Farm?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to High Prairie Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page