Natural gasCoalOperatingFPC

Crystal River

Natural gas and coal power plant in Citrus County, Florida. 3,449 MW of nameplate capacity across 8 generators, operated by Duke Energy Florida, LLC.

Also known as Crystal River Power Plant · EIA plant 628

Analyst: free account, 1 question a day.

Rattler Solar PlantBronson SolarHardeetown Solar Powe…Crystal River25 km
Open in the map
6 plants within 60 km, from EIA coordinates.

Key facts

Capacity
3,449 MWNatural gas 1,970.6 · Coal 1,478.4
Generators
8 operatingEIA-860M, August 2026
Operating since
December 1982First generator online
Operator
Duke Energy Florida, LLCEIA operator ID 6455
Grid
FPCBalancing authority FPC
Price nodes
None linkedNo verified ISO node
Location
Citrus County, FL28.9656, −82.6977
EIA plant ID
628EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Crystal River produces

Free · EIA-923

Net generation, 2025

15.3 TWh

15,307,405 MWh, final

Capacity factor, 2025

50.7%

2024: 51.1%

January to July 2026

9.47 TWh

Provisional

Range, 2015 to 2025

8.8–16.2

TWh a year. Low 2017, high 2021

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200021,123,039Not reported12 of 12
200120,736,446Not reported12 of 12
200221,765,974Not reported12 of 12
200321,817,071Not reported12 of 12
200422,451,979Not reported12 of 12
200522,237,071Not reported12 of 12
200621,968,604Not reported12 of 12
200722,008,891Not reported12 of 12
200821,260,604Not reported12 of 12
200916,525,561Not reported12 of 12
201012,148,45041.6%12 of 12
201110,808,73237.0%12 of 12
20121,214,55625.3%2 of 12
20131,443,573Not reported2 of 12
201411,760,27555.0%12 of 12
20159,744,87245.5%12 of 12
20168,885,47241.4%12 of 12
20178,754,76940.9%12 of 12
2018Not reportedNot reported0 of 12
201915,044,13949.8%12 of 12
202014,947,72449.3%12 of 12
202116,157,35353.5%12 of 12
202215,701,08252.0%12 of 12
202316,086,13153.2%12 of 12
202415,470,90451.1%12 of 12
202515,307,40550.7%12 of 12
2026 (provisional, partial year)9,467,34353.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

8.81M

US short tons. 2024: 8.47M

SO₂, 2025

3,600

US short tons

NOx, 2025

4,764

US short tons

CO₂ per MWh, calculated

0.58 t

About 1,152 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (1, 1GTA, 1GTB, 2, 2GTA, 2GTB, 4, 5), matched to EIA plant 628 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

70,346

million gallons

Consumption, 2024

22,317

million gallons

Source

Gulf of Mexico

Surface, Saline. Induced-draft tower

Watershed stress

Very low/none · 0.181

USGS SUI, HUC12 Little Rocky Creek-Crystal Bay

48 of 48 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1GTANatural Gas Fired Combined Cycle310.3October 2018
1GTBNatural Gas Fired Combined Cycle310.3October 2018
2GTANatural Gas Fired Combined Cycle310.3November 2018
2GTBNatural Gas Fired Combined Cycle310.3November 2018
5Conventional Steam Coal739.2October 1984
CC1STNatural Gas Fired Combined Cycle364.7October 2018
CC2STNatural Gas Fired Combined Cycle364.7November 2018
ST4Conventional Steam Coal739.2December 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Florida, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Crystal River and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Crystal River

More plants operated by Duke Energy Florida, LLC

Questions about Crystal River

How much power does Crystal River produce?

Crystal River reported 15,307,405 MWh (15.3 TWh) of net generation in 2025, a 50.7% capacity factor on 3,449 MW of nameplate capacity. From January to July 2026 it reported 9.47 TWh, which is provisional.

Where is Crystal River?

Crystal River is in Citrus County, Florida, at 28.9656, −82.6977. It is in the Progress Energy Florida balancing area (FPC).

Who operates Crystal River?

EIA-860M for August 2026 lists Duke Energy Florida, LLC as the operator (EIA operator ID 6455). The operator is not always the owner.

Is Crystal River a natural gas or a coal plant?

Both. Natural gas capacity totals 1,970.6 MW and coal capacity totals 1,478.4 MW.

When did Crystal River start operating?

Its first generator began operating in December 1982, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page