SolarOperatingPACE

Milford Solar 1

Solar power plant in Beaver County, Utah. 99 MW of nameplate capacity across 1 generator, operated by Milford Solar 1, LLC.

Also known as EIA plant 62812

Analyst: free account, 1 question a day.

Escalante Solar II, LLCEscalante Solar III, LLCEscalante Solar I, LLCMilford Wind Corridor I LLCGranite Peak Solar PlantSmithfield 1Milford Solar 15 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
99 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2020First generator online
Operator
Milford Solar 1, LLCEIA operator ID 66040
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Beaver County, UT38.4907, −113.0183
EIA plant ID
62812EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Milford Solar 1 produces

Free · EIA-923

Net generation, 2025

261 GWh

260,650 MWh, final

Capacity factor, 2025

30.1%

2024: 29.2%

January to July 2026

162 GWh

Provisional

Range, 2021 to 2025

253.5–267.7

GWh a year. Low 2024, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202027,937Not reported2 of 12
2021267,74730.9%12 of 12
2022258,46529.8%12 of 12
2023259,87030.0%12 of 12
2024253,54229.2%12 of 12
2025260,65030.1%12 of 12
2026 (provisional, partial year)161,50932.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MS1Solar Photovoltaic99.0November 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Milford Solar 1, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Milford Solar 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Milford Solar 1

Questions about Milford Solar 1

How much power does Milford Solar 1 produce?

Milford Solar 1 reported 260,650 MWh (261 GWh) of net generation in 2025, a 30.1% capacity factor on 99 MW of nameplate capacity. From January to July 2026 it reported 162 GWh, which is provisional.

Where is Milford Solar 1?

Milford Solar 1 is in Beaver County, Utah, at 38.4907, −113.0183. It is in the PacifiCorp - East balancing area (PACE).

Who operates Milford Solar 1?

EIA-860M for August 2026 lists Milford Solar 1, LLC as the operator (EIA operator ID 66040). The operator is not always the owner.

When did Milford Solar 1 start operating?

Its first generator began operating in November 2020, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page