SolarOperatingPACE

Escalante Solar II, LLC

Solar power plant in Beaver County, Utah. 80 MW of nameplate capacity across 1 generator, operated by Clearway Renewable Operation & Maintenance LLC.

Also known as Escalante Solar II · EIA plant 59388

Analyst: free account, 1 question a day.

Escalante Solar I, LLCEscalante Solar III, LLCMilford Wind Corridor I LLCGranite Peak Solar PlantMilford Wind Corridor Stage II LLCEscalante Solar II5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
80 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2016First generator online
Operator
Clearway Renewable Operation & Maintenance LLCEIA operator ID 64629
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Beaver County, UT38.5008, −113.0300
EIA plant ID
59388EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Escalante Solar II produces

Free · EIA-923

Net generation, 2025

212 GWh

211,610 MWh, final

Capacity factor, 2025

30.2%

2024: 30.2%

January to July 2026

131 GWh

Provisional

Range, 2017 to 2025

203.7–218.4

GWh a year. Low 2019, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201694,435Not reported7 of 12
2017209,25629.9%12 of 12
2018208,00229.7%12 of 12
2019203,68129.1%12 of 12
2020218,37631.1%12 of 12
2021209,37729.9%12 of 12
2022209,68729.9%12 of 12
2023203,74629.1%12 of 12
2024212,10330.2%12 of 12
2025211,61030.2%12 of 12
2026 (provisional, partial year)131,15032.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ESCS2Solar Photovoltaic80.0August 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Clearway Renewable Operation & Maintenance LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Escalante Solar II, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Escalante Solar II

More plants operated by Clearway Renewable Operation & Maintenance LLC

Questions about Escalante Solar II

How much power does Escalante Solar II, LLC produce?

Escalante Solar II, LLC reported 211,610 MWh (212 GWh) of net generation in 2025, a 30.2% capacity factor on 80 MW of nameplate capacity. From January to July 2026 it reported 131 GWh, which is provisional.

Where is Escalante Solar II, LLC?

Escalante Solar II, LLC is in Beaver County, Utah, at 38.5008, −113.0300. It is in the PacifiCorp - East balancing area (PACE).

Who operates Escalante Solar II, LLC?

EIA-860M for August 2026 lists Clearway Renewable Operation & Maintenance LLC as the operator (EIA operator ID 64629). The operator is not always the owner.

When did Escalante Solar II, LLC start operating?

Its first generator began operating in August 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page