Milford Wind Corridor Stage II LLC
Wind power plant in Beaver County, Utah. 102 MW of nameplate capacity across 1 generator, operated by Milford Wind Corridor Stage II LLC.
Also known as Milford Wind Corridor Stage II · Milford Phase II · EIA plant 57107
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 102 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- May 2011First generator online
- Operator
- Milford Wind Corridor Stage II LLCEIA operator ID 56409
- Grid
- LDWPBalancing authority LDWP
- Price nodes
- None linkedNo verified ISO node
- Location
- Beaver County, UT38.5852, −112.9310
- EIA plant ID
- 57107EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Milford Wind Corridor Stage II produces
Free · EIA-923Net generation, 2025
199 GWh
198,515 MWh, final
Capacity factor, 2025
22.2%
2024: 19.2%
January to July 2026
92.5 GWh
Provisional
Range, 2015 to 2025
158.9–214.4
GWh a year. Low 2023, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 110,991 | Not reported | 8 of 12 |
| 2012 | 206,775 | 23.1% | 12 of 12 |
| 2013 | 155,246 | 17.4% | 12 of 12 |
| 2014 | 199,197 | 22.3% | 12 of 12 |
| 2015 | 187,583 | 21.0% | 12 of 12 |
| 2016 | 214,357 | 23.9% | 12 of 12 |
| 2017 | 212,006 | 23.7% | 12 of 12 |
| 2018 | 197,100 | 22.1% | 12 of 12 |
| 2019 | 200,272 | 22.4% | 12 of 12 |
| 2020 | 195,113 | 21.8% | 12 of 12 |
| 2021 | 199,311 | 22.3% | 12 of 12 |
| 2022 | 170,164 | 19.0% | 12 of 12 |
| 2023 | 158,888 | 17.8% | 12 of 12 |
| 2024 | 171,996 | 19.2% | 12 of 12 |
| 2025 | 198,515 | 22.2% | 12 of 12 |
| 2026 (provisional, partial year) | 92,545 | 17.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 102.0 | May 2011 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Milford Wind Corridor Stage II LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Milford Wind Corridor Stage II LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Milford Wind Corridor Stage II
Questions about Milford Wind Corridor Stage II
How much power does Milford Wind Corridor Stage II LLC produce?
Milford Wind Corridor Stage II LLC reported 198,515 MWh (199 GWh) of net generation in 2025, a 22.2% capacity factor on 102 MW of nameplate capacity. From January to July 2026 it reported 92.5 GWh, which is provisional.
Where is Milford Wind Corridor Stage II LLC?
Milford Wind Corridor Stage II LLC is in Beaver County, Utah, at 38.5852, −112.9310. It is in the Los Angeles Department of Water and Power balancing area (LDWP).
Who operates Milford Wind Corridor Stage II LLC?
EIA-860M for August 2026 lists Milford Wind Corridor Stage II LLC as the operator (EIA operator ID 56409). The operator is not always the owner.
When did Milford Wind Corridor Stage II LLC start operating?
Its first generator began operating in May 2011, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page