Key facts

Capacity
125.1 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2020First generator online
Operator
Paulding Wind Farm IV LLCEIA operator ID 62796
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Paulding County, OH41.1210, −84.7510
EIA plant ID
62944EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Timber Road IV produces

Free · EIA-923

Net generation, 2025

395 GWh

394,557 MWh, final

Capacity factor, 2025

36.0%

2024: 34.7%

January to July 2026

252 GWh

Provisional

Range, 2020 to 2025

302.7–421.1

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020302,695Not reported12 of 12
2021377,58834.5%12 of 12
2022421,10038.4%12 of 12
2023379,20034.6%12 of 12
2024381,63534.7%12 of 12
2025394,55736.0%12 of 12
2026 (provisional, partial year)252,42939.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TRIVOnshore Wind Turbine125.1January 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Paulding Wind Farm IV LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Timber Road IV and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Timber Road IV

Questions about Timber Road IV

How much power does Timber Road IV produce?

Timber Road IV reported 394,557 MWh (395 GWh) of net generation in 2025, a 36.0% capacity factor on 125.1 MW of nameplate capacity. From January to July 2026 it reported 252 GWh, which is provisional.

Where is Timber Road IV?

Timber Road IV is in Paulding County, Ohio, at 41.1210, −84.7510. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Timber Road IV?

EIA-860M for August 2026 lists Paulding Wind Farm IV LLC as the operator (EIA operator ID 62796). The operator is not always the owner.

When did Timber Road IV start operating?

Its first generator began operating in January 2020, according to EIA-860M.

Does InfraMap have power prices for Timber Road IV?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Timber Road IV, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page