Paulding Wind Farm II
Wind power plant in Paulding County, Ohio. 99 MW of nameplate capacity across 1 generator, operated by Paulding Wind Farm II LLC.
Also known as Timber Road II · EIA plant 57620
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 99 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- July 2011First generator online
- Operator
- Paulding Wind Farm II LLCEIA operator ID 56936
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Paulding County, OH41.0253, −84.7792
- EIA plant ID
- 57620EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Paulding Wind Farm II produces
Free · EIA-923Net generation, 2025
318 GWh
318,322 MWh, final
Capacity factor, 2025
36.7%
2024: 34.7%
January to July 2026
200 GWh
Provisional
Range, 2015 to 2025
300.2–344.9
GWh a year. Low 2023, high 2017
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 152,825 | Not reported | 6 of 12 |
| 2012 | 246,785 | 18.7% | 12 of 12 |
| 2013 | 279,354 | 21.3% | 12 of 12 |
| 2014 | 327,707 | Not reported | 12 of 12 |
| 2015 | 336,861 | 38.8% | 12 of 12 |
| 2016 | 331,587 | 38.1% | 12 of 12 |
| 2017 | 344,899 | 39.8% | 12 of 12 |
| 2018 | 311,716 | 35.9% | 12 of 12 |
| 2019 | 322,789 | 37.2% | 12 of 12 |
| 2020 | 314,021 | 36.1% | 12 of 12 |
| 2021 | 301,855 | 34.8% | 12 of 12 |
| 2022 | 334,790 | 38.6% | 12 of 12 |
| 2023 | 300,185 | 34.6% | 12 of 12 |
| 2024 | 302,042 | 34.7% | 12 of 12 |
| 2025 | 318,322 | 36.7% | 12 of 12 |
| 2026 (provisional, partial year) | 199,556 | 39.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 99.0 | July 2011 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Paulding Wind Farm II LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Paulding Wind Farm II and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Paulding Wind Farm II
Questions about Paulding Wind Farm II
How much power does Paulding Wind Farm II produce?
Paulding Wind Farm II reported 318,322 MWh (318 GWh) of net generation in 2025, a 36.7% capacity factor on 99 MW of nameplate capacity. From January to July 2026 it reported 200 GWh, which is provisional.
Where is Paulding Wind Farm II?
Paulding Wind Farm II is in Paulding County, Ohio, at 41.0253, −84.7792. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Paulding Wind Farm II?
EIA-860M for August 2026 lists Paulding Wind Farm II LLC as the operator (EIA operator ID 56936). The operator is not always the owner.
When did Paulding Wind Farm II start operating?
Its first generator began operating in July 2011, according to EIA-860M.
Does InfraMap have power prices for Paulding Wind Farm II?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Paulding Wind Farm II, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page