Natural gasOperatingPJM

Robert P Mone Plant

Natural gas power plant in Van Wert County, Ohio. 596.7 MW of nameplate capacity across 3 generators, operated by Buckeye Power, Inc.

Also known as Robert P. Mone Generating Station · EIA plant 7872

Analyst: free account, 1 question a day.

Paulding Wind Farm IICooper Farms VW ProjectNorthwest Ohio WindTimber Road Solar ParkRobert P Mone Plant10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
596.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 2002First generator online
Operator
Buckeye Power, IncEIA operator ID 7004
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
Van Wert County, OH40.9297, −84.7392
EIA plant ID
7872EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Robert P Mone Plant produces

Free · EIA-923

Net generation, 2025

328 GWh

327,868 MWh, final

Capacity factor, 2025

6.3%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

35.3–549.8

GWh a year. Low 2015, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200386,510Not reported12 of 12
200462,232Not reported12 of 12
2005137,369Not reported12 of 12
200666,625Not reported12 of 12
2007170,428Not reported12 of 12
200826,589Not reported12 of 12
200914,781Not reported12 of 12
201047,6410.9%12 of 12
201153,8981.0%12 of 12
201283,1471.6%12 of 12
201344,7840.9%12 of 12
201440,7360.8%12 of 12
201535,3430.7%12 of 12
2016105,5282.0%12 of 12
2017101,8672.0%12 of 12
2018422,7548.1%12 of 12
2019138,4332.7%12 of 12
2020174,1753.3%12 of 12
2021279,3935.4%12 of 12
2022549,76010.6%12 of 12
2023184,9783.6%12 of 12
2024310,253Not reported12 of 12
2025327,8686.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

217,773

US short tons. 2024: 201,018

SO₂, 2025

3

US short tons

NOx, 2025

264

US short tons

CO₂ per MWh, calculated

0.66 t

About 1,328 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 7872 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine198.9July 2002
2Natural Gas Fired Combustion Turbine198.9July 2002
3Natural Gas Fired Combustion Turbine198.9July 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Buckeye Power, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Robert P Mone Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Robert P Mone Plant

More plants operated by Buckeye Power, Inc

Questions about Robert P Mone Plant

How much power does Robert P Mone Plant produce?

Robert P Mone Plant reported 327,868 MWh (328 GWh) of net generation in 2025, a 6.3% capacity factor on 596.7 MW of nameplate capacity.

Where is Robert P Mone Plant?

Robert P Mone Plant is in Van Wert County, Ohio, at 40.9297, −84.7392. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Robert P Mone Plant?

EIA-860M for August 2026 lists Buckeye Power, Inc as the operator (EIA operator ID 7004). The operator is not always the owner.

When did Robert P Mone Plant start operating?

Its first generator began operating in July 2002, according to EIA-860M.

Does InfraMap have power prices for Robert P Mone Plant?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Robert P Mone Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page