Natural gasOperatingPJM

Greenville Electric Generating Station

Natural gas power plant in Darke County, Ohio. 236 MW of nameplate capacity across 4 generators, operated by Buckeye Power, Inc.

Also known as EIA plant 55228

Analyst: free account, 1 question a day.

Whirlpool Corp-Greenv…DG AMP Solar VersaillesVersailles PeakingRichmond Solar Park 3Greenville Electric20 km
Open in the map
6 plants within 32 km, from EIA coordinates.

Key facts

Capacity
236 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
June 2000First generator online
Operator
Buckeye Power, IncEIA operator ID 7004
Grid
PJMBalancing authority PJM
Price nodes
4 PJM nodesResource nodes with prices
Location
Darke County, OH40.0758, −84.6151
EIA plant ID
55228EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Greenville Electric produces

Free · EIA-923

Net generation, 2025

82.2 GWh

82,206 MWh, final

Capacity factor, 2025

4.0%

2024: 5.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

42.4–212.5

GWh a year. Low 2015, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200037,256Not reported12 of 12
2001120,049Not reported12 of 12
2002148,333Not reported12 of 12
200349,159Not reported12 of 12
200439,943Not reported12 of 12
200554,148Not reported12 of 12
200645,472Not reported12 of 12
200752,821Not reported12 of 12
200820,295Not reported12 of 12
200918,978Not reported12 of 12
201056,6402.7%12 of 12
201144,1082.1%12 of 12
201263,9093.1%12 of 12
201337,5081.8%12 of 12
201447,9382.3%12 of 12
201542,3782.0%12 of 12
201686,1664.2%12 of 12
201793,6274.5%12 of 12
2018212,53710.3%12 of 12
2019190,7529.2%12 of 12
202098,1434.7%12 of 12
2021185,5849.0%12 of 12
2022200,0869.7%12 of 12
202368,4623.3%12 of 12
2024105,0145.1%12 of 12
202582,2064.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

55,271

US short tons. 2024: 68,946

SO₂, 2025

1

US short tons

NOx, 2025

47

US short tons

CO₂ per MWh, calculated

0.67 t

About 1,345 lb per MWh

8 of 8 EPA units reported CO₂ in 2025 (G1CT1, G1CT2, G2CT1, G2CT2, G3CT1, G3CT2, G4CT1, G4CT2), matched to EIA plant 55228 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combustion Turbine59.0June 2000
GT2Natural Gas Fired Combustion Turbine59.0June 2000
GT3Natural Gas Fired Combustion Turbine59.0June 2000
GT4Natural Gas Fired Combustion Turbine59.0June 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Buckeye Power, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Greenville Electric Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Greenville Electric

More plants operated by Buckeye Power, Inc

Questions about Greenville Electric

How much power does Greenville Electric Generating Station produce?

Greenville Electric Generating Station reported 82,206 MWh (82.2 GWh) of net generation in 2025, a 4.0% capacity factor on 236 MW of nameplate capacity.

Where is Greenville Electric Generating Station?

Greenville Electric Generating Station is in Darke County, Ohio, at 40.0758, −84.6151. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Greenville Electric Generating Station?

EIA-860M for August 2026 lists Buckeye Power, Inc as the operator (EIA operator ID 7004). The operator is not always the owner.

When did Greenville Electric Generating Station start operating?

Its first generator began operating in June 2000, according to EIA-860M.

Does InfraMap have power prices for Greenville Electric Generating Station?

Yes. InfraMap has PJM day-ahead and real-time prices at 4 price nodes linked to Greenville Electric Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page