SolarOperatingTAL

FL Solar 4, LLC

Solar power plant in Leon County, Florida. 42 MW of nameplate capacity across 1 generator, operated by Onward Energy.

Also known as Tallahassee Airport Solar Farm · EIA plant 63187

Analyst: free account, 1 question a day.

S O PurdomFL Solar D2, LLCCoTAL Solar FarmSub 12Arvah B HopkinsFL Solar 410 km
Open in the map
5 plants within 29 km, from EIA coordinates.

Key facts

Capacity
42 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2019First generator online
Operator
Onward EnergyEIA operator ID 60453
Grid
TALBalancing authority TAL
Price nodes
None linkedNo verified ISO node
Location
Leon County, FL30.2354, −84.2233
EIA plant ID
63187EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power FL Solar 4 produces

Free · EIA-923

Net generation, 2025

69.9 GWh

69,918 MWh, final

Capacity factor, 2025

19.0%

2024: 17.6%

January to July 2026

42.8 GWh

Provisional

Range, 2020 to 2025

61.9–73.5

GWh a year. Low 2021, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
20191,422Not reported1 of 12
202073,51619.9%12 of 12
202161,89716.8%12 of 12
202273,51720.0%12 of 12
202370,00219.0%12 of 12
202464,86017.6%12 of 12
202569,91819.0%12 of 12
2026 (provisional, partial year)42,84520.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
FL4Solar Photovoltaic42.0December 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Onward Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query FL Solar 4, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near FL Solar 4

More plants operated by Onward Energy

Questions about FL Solar 4

How much power does FL Solar 4, LLC produce?

FL Solar 4, LLC reported 69,918 MWh (69.9 GWh) of net generation in 2025, a 19.0% capacity factor on 42 MW of nameplate capacity. From January to July 2026 it reported 42.8 GWh, which is provisional.

Where is FL Solar 4, LLC?

FL Solar 4, LLC is in Leon County, Florida, at 30.2354, −84.2233. It is in the City of Tallahassee balancing area (TAL).

Who operates FL Solar 4, LLC?

EIA-860M for August 2026 lists Onward Energy as the operator (EIA operator ID 60453). The operator is not always the owner.

When did FL Solar 4, LLC start operating?

Its first generator began operating in December 2019, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page