SolarBattery storageOperatingERCOT

2W Permian Solar Project Hybrid

Solar project in Andrews County, Texas. 460 MW of nameplate capacity across 2 generators, operated by 2W Permian Solar, LLC.

Also known as EIA plant 63255

This project groups 2W Permian Solar Project Hybrid (EIA 63255). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Ector County Energy CenterOxy Renewable Energy - GoldsmithGoldsmithBakkeN. Mary FrancisTumbleweed2W Permian Solar Proj…10 km
Open in the map
6 plants within 26 km, from EIA coordinates.

Key facts

Capacity
460 MWSolar 420.0 · Battery storage 40.0
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2021First generator online
Operator
2W Permian Solar, LLCEIA operator ID 63012
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Andrews County, TX32.1164, −102.5283
EIA plant ID
63255EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power 2W Permian Solar Project Hybrid produces

Free · EIA-923

Net generation, 2025

1.01 TWh

1,005,292 MWh, final

Capacity factor, 2025

27.4%

2024: 24.7%

January to July 2026

616 GWh

Provisional

Range, 2022 to 2025

0.9–1.0

TWh a year. Low 2023, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021597,559Not reported9 of 12
2022939,90925.6%12 of 12
2023905,29624.7%12 of 12
2024908,41524.7%12 of 12
20251,005,29227.4%12 of 12
2026 (provisional, partial year)615,60228.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2WPBABatteries40.0October 2021
2WPSOSolar Photovoltaic420.0August 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists 2W Permian Solar, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query 2W Permian Solar Project Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near 2W Permian Solar Project Hybrid

Questions about 2W Permian Solar Project Hybrid

How much power does 2W Permian Solar Project Hybrid produce?

2W Permian Solar Project Hybrid reported 1,005,292 MWh (1.01 TWh) of net generation in 2025, a 27.4% capacity factor on 460 MW of nameplate capacity. From January to July 2026 it reported 616 GWh, which is provisional.

Where is 2W Permian Solar Project Hybrid?

2W Permian Solar Project Hybrid is in Andrews County, Texas, at 32.1164, −102.5283. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates 2W Permian Solar Project Hybrid?

EIA-860M for August 2026 lists 2W Permian Solar, LLC as the operator (EIA operator ID 63012). The operator is not always the owner.

When did 2W Permian Solar Project Hybrid start operating?

Its first generator began operating in August 2021, according to EIA-860M.

Does InfraMap have power prices for 2W Permian Solar Project Hybrid?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to 2W Permian Solar Project Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page