SolarOperatingMISO

M72 West Solar

Solar power plant in Leelanau County, Michigan. 1.8 MW of nameplate capacity across 1 generator, operated by Heritage Sustainable Energy. LLC.

Also known as EIA plant 63660

Analyst: free account, 1 question a day.

Kalkaska CT #1HodenpylM72 West Solar25 km
Open in the map
4 plants within 47 km, from EIA coordinates.

Key facts

Capacity
1.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2019First generator online
Operator
Heritage Sustainable Energy. LLCEIA operator ID 62870
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Leelanau County, MI44.7768, −85.7014
EIA plant ID
63660EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power M72 West Solar produces

Free · EIA-923

Net generation, 2025

2.25 GWh

2,252 MWh, final

Capacity factor, 2025

14.3%

2024: 15.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2020 to 2025

1.7–2.5

GWh a year. Low 2021, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
201953Not reported1 of 12
20201,93512.2%12 of 12
20211,70010.8%12 of 12
20222,23314.2%12 of 12
20232,09713.3%12 of 12
20242,52015.9%12 of 12
20252,25214.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
M72WSolar Photovoltaic1.8December 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Heritage Sustainable Energy. LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query M72 West Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near M72 West Solar

More plants operated by Heritage Sustainable Energy. LLC

Questions about M72 West Solar

How much power does M72 West Solar produce?

M72 West Solar reported 2,252 MWh (2.25 GWh) of net generation in 2025, a 14.3% capacity factor on 1.8 MW of nameplate capacity.

Where is M72 West Solar?

M72 West Solar is in Leelanau County, Michigan, at 44.7768, −85.7014. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates M72 West Solar?

EIA-860M for August 2026 lists Heritage Sustainable Energy. LLC as the operator (EIA operator ID 62870). The operator is not always the owner.

When did M72 West Solar start operating?

Its first generator began operating in December 2019, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page