SolarBattery storageOperatingNEVP

Dry Lake Solar Energy Center

Solar and battery storage project in Clark County, Nevada. 250 MW of nameplate capacity across 2 generators, operated by Nevada Power Co.

Also known as EIA plant 63933

This project groups Dry Lake Solar Energy Center (EIA 63933). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Harry AllenPlaya Solar 2Playa Solar 1, LLCArrow Canyon Solar HybridChuck Lenzie Generating StationDry Lake Solar2 km
Open in the map
6 plants within 5.6 km, from EIA coordinates.

Key facts

Capacity
250 MWSolar 150.0 · Battery storage 100.0
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2024First generator online
Operator
Nevada Power CoEIA operator ID 13407
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.4273, −114.8907
EIA plant ID
63933EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Dry Lake Solar produces

Free · EIA-923

Net generation, 2025

362 GWh

362,301 MWh, final

Capacity factor, 2025

28.8%

2024: Not reported

January to July 2026

256 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024260,511Not reported8 of 12
2025362,30128.8%12 of 12
2026 (provisional, partial year)256,19334.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
DLES1Batteries100.0May 2024
DLPV1Solar Photovoltaic150.0May 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nevada Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Dry Lake Solar Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Dry Lake Solar

More plants operated by Nevada Power Co

Questions about Dry Lake Solar

How much power does Dry Lake Solar Energy Center produce?

Dry Lake Solar Energy Center reported 362,301 MWh (362 GWh) of net generation in 2025, a 28.8% capacity factor on 250 MW of nameplate capacity. From January to July 2026 it reported 256 GWh, which is provisional.

Where is Dry Lake Solar Energy Center?

Dry Lake Solar Energy Center is in Clark County, Nevada, at 36.4273, −114.8907. It is in the Nevada Power Company balancing area (NEVP).

Who operates Dry Lake Solar Energy Center?

EIA-860M for August 2026 lists Nevada Power Co as the operator (EIA operator ID 13407). The operator is not always the owner.

Is Dry Lake Solar Energy Center a solar or a battery storage plant?

Both. Solar capacity totals 150 MW and battery storage capacity totals 100 MW.

When did Dry Lake Solar Energy Center start operating?

Its first generator began operating in May 2024, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page