Arrow Canyon Solar Hybrid
Solar and battery storage project in Clark County, Nevada. 275 MW of nameplate capacity across 2 generators, operated by Arrow Canyon Solar LLC.
Also known as EIA plant 62248
This project groups Arrow Canyon Solar Hybrid (EIA 62248). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 275 MWSolar 200.0 · Battery storage 75.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- December 2023First generator online
- Operator
- Arrow Canyon Solar LLCEIA operator ID 61768
- Grid
- NEVPBalancing authority NEVP
- Price nodes
- None linkedNo verified ISO node
- Location
- Clark County, NV36.4593, −114.8444
- EIA plant ID
- 62248EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Arrow Canyon Solar Hybrid produces
Free · EIA-923Net generation, 2025
595 GWh
595,106 MWh, final
Capacity factor, 2025
34.8%
2024: 34.9%
January to July 2026
385 GWh
Provisional
Range, 2024 to 2025
595.1–599.6
GWh a year. Low 2025, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 29,326 | Not reported | 1 of 12 |
| 2023 | 31,100 | Not reported | 1 of 12 |
| 2024 | 599,632 | 34.9% | 12 of 12 |
| 2025 | 595,106 | 34.8% | 12 of 12 |
| 2026 (provisional, partial year) | 384,633 | 38.5% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Solar Photovoltaic | 200.0 | December 2023 |
| 2 | Batteries | 75.0 | December 2023 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arrow Canyon Solar LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Arrow Canyon Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Arrow Canyon Solar Hybrid
Questions about Arrow Canyon Solar Hybrid
How much power does Arrow Canyon Solar Hybrid produce?
Arrow Canyon Solar Hybrid reported 595,106 MWh (595 GWh) of net generation in 2025, a 34.8% capacity factor on 275 MW of nameplate capacity. From January to July 2026 it reported 385 GWh, which is provisional.
Where is Arrow Canyon Solar Hybrid?
Arrow Canyon Solar Hybrid is in Clark County, Nevada, at 36.4593, −114.8444. It is in the Nevada Power Company balancing area (NEVP).
Who operates Arrow Canyon Solar Hybrid?
EIA-860M for August 2026 lists Arrow Canyon Solar LLC as the operator (EIA operator ID 61768). The operator is not always the owner.
Is Arrow Canyon Solar Hybrid a solar or a battery storage plant?
Both. Solar capacity totals 200 MW and battery storage capacity totals 75 MW.
When did Arrow Canyon Solar Hybrid start operating?
Its first generator began operating in December 2023, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page