SolarBattery storageOperatingNEVP

Gemini Solar Hybrid

Solar and battery storage project in Clark County, Nevada. 1,070 MW of nameplate capacity across 2 generators, operated by Gemini Solar.

Also known as Gemini Solar · EIA plant 63352

This project groups Gemini Solar Hybrid (EIA 63352). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Arrow Canyon Solar Hy…Moapa Southern PaiuteDry Lake Solar Energy CenterHarry AllenPlaya Solar 2Gemini Solar Hybrid5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
1,070 MWSolar 690.0 · Battery storage 380.0
Generators
2 operatingEIA-860M, August 2026
Operating since
March 2024First generator online
Operator
Gemini SolarEIA operator ID 63117
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.4678, −114.8060
EIA plant ID
63352EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gemini Solar Hybrid produces

Free · EIA-923

Net generation, 2025

2.18 TWh

2,181,408 MWh, final

Capacity factor, 2025

37.2%

2024: Not reported

January to July 2026

1.32 TWh

Provisional

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
20241,600,785Not reported10 of 12
20252,181,40837.2%12 of 12
2026 (provisional, partial year)1,321,06238.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ARBE1Solar Photovoltaic690.0March 2024
ARPV1Batteries380.0March 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Gemini Solar as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gemini Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gemini Solar Hybrid

Questions about Gemini Solar Hybrid

How much power does Gemini Solar Hybrid produce?

Gemini Solar Hybrid reported 2,181,408 MWh (2.18 TWh) of net generation in 2025, a 37.2% capacity factor on 1,070 MW of nameplate capacity. From January to July 2026 it reported 1.32 TWh, which is provisional.

Where is Gemini Solar Hybrid?

Gemini Solar Hybrid is in Clark County, Nevada, at 36.4678, −114.8060. It is in the Nevada Power Company balancing area (NEVP).

Who operates Gemini Solar Hybrid?

EIA-860M for August 2026 lists Gemini Solar as the operator (EIA operator ID 63117). The operator is not always the owner.

Is Gemini Solar Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 690 MW and battery storage capacity totals 380 MW.

When did Gemini Solar Hybrid start operating?

Its first generator began operating in March 2024, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page