Dodge County Solar Hybrid
Solar and battery storage project in Dodge County, Nebraska. 1.4 MW of nameplate capacity across 2 generators, operated by BCSB, LLC.
Also known as EIA plant 64223
This project groups Dodge County Solar Hybrid (EIA 64223). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1.4 MWSolar 0.7 · Battery storage 0.7
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 2021First generator online
- Operator
- BCSB, LLCEIA operator ID 63842
- Grid
- SPPBalancing authority SWPP
- Price nodes
- None linkedNo verified ISO node
- Location
- Dodge County, NE41.6120, −96.7520
- EIA plant ID
- 64223EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Dodge County Solar Hybrid produces
Free · EIA-923Net generation, 2025
1.38 GWh
1,382 MWh, final
Capacity factor, 2025
22.7%
2024: 24.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2022 to 2025
1.4–1.5
GWh a year. Low 2025, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | 1,017 | Not reported | 7 of 12 |
| 2022 | 1,506 | 25.4% | 12 of 12 |
| 2023 | 1,482 | 24.4% | 12 of 12 |
| 2024 | 1,465 | 24.1% | 12 of 12 |
| 2025 | 1,382 | 22.7% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Solar Photovoltaic | 0.7 | June 2021 |
| 2 | Batteries | 0.7 | June 2021 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists BCSB, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Dodge County Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Dodge County Solar Hybrid
More plants operated by BCSB, LLC
Questions about Dodge County Solar Hybrid
How much power does Dodge County Solar Hybrid produce?
Dodge County Solar Hybrid reported 1,382 MWh (1.38 GWh) of net generation in 2025, a 22.7% capacity factor on 1.4 MW of nameplate capacity.
Where is Dodge County Solar Hybrid?
Dodge County Solar Hybrid is in Dodge County, Nebraska, at 41.6120, −96.7520. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Dodge County Solar Hybrid?
EIA-860M for August 2026 lists BCSB, LLC as the operator (EIA operator ID 63842). The operator is not always the owner.
Is Dodge County Solar Hybrid a solar or a battery storage plant?
Both. Solar capacity totals 0.7 MW and battery storage capacity totals 0.7 MW.
When did Dodge County Solar Hybrid start operating?
Its first generator began operating in June 2021, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page