SolarOperatingERCOT

7V Solar Ranch

Solar power plant in Fayette County, Texas. 240 MW of nameplate capacity across 1 generator, operated by 7V Solar Ranch, LLC.

Also known as EIA plant 64239

Analyst: free account, 1 question a day.

Big Star Solar, LLC (…Winchester Power ParkSim Gideon7V Solar Ranch25 km
Open in the map
5 plants within 42 km, from EIA coordinates.

Key facts

Capacity
240 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2025First generator online
Operator
7V Solar Ranch, LLCEIA operator ID 63830
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Fayette County, TX29.8070, −97.0741
EIA plant ID
64239EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power 7V Solar Ranch produces

Free · EIA-923

Net generation, 2025

501 GWh

501,270 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

318 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
2025501,270Not reported12 of 12
2026 (provisional, partial year)317,78026.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
7V1Solar Photovoltaic240.0January 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists 7V Solar Ranch, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query 7V Solar Ranch and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near 7V Solar Ranch

Questions about 7V Solar Ranch

How much power does 7V Solar Ranch produce?

7V Solar Ranch reported 501,270 MWh (501 GWh) of net generation in 2025. From January to July 2026 it reported 318 GWh, which is provisional.

Where is 7V Solar Ranch?

7V Solar Ranch is in Fayette County, Texas, at 29.8070, −97.0741. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates 7V Solar Ranch?

EIA-860M for August 2026 lists 7V Solar Ranch, LLC as the operator (EIA operator ID 63830). The operator is not always the owner.

When did 7V Solar Ranch start operating?

Its first generator began operating in January 2025, according to EIA-860M.

Does InfraMap have power prices for 7V Solar Ranch?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to 7V Solar Ranch, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page