Natural gasOperatingERCOT

Sim Gideon

Natural gas power plant in Bastrop County, Texas. 623 MW of nameplate capacity across 3 generators, operated by Lower Colorado River Authority.

Also known as Sim Gideon Power Plant · EIA plant 3601

Analyst: free account, 1 question a day.

Webberville Solar ProjectBig Star Solar, LLC (Hybrid)Winchester Power ParkTX21 River Valley Storage 2Sim Gideon10 km
Open in the map
6 plants within 31 km, from EIA coordinates.

Key facts

Capacity
623 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 1965First generator online
Operator
Lower Colorado River AuthorityEIA operator ID 11269
Grid
ERCOTBalancing authority ERCO
Price nodes
3 ERCOT nodesResource nodes with prices
Location
Bastrop County, TX30.1456, −97.2708
EIA plant ID
3601EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sim Gideon produces

Free · EIA-923

Net generation, 2025

827 GWh

826,681 MWh, final

Capacity factor, 2025

15.1%

2024: 19.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

0.3–1.2

TWh a year. Low 2017, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,214,828Not reported12 of 12
20011,475,704Not reported12 of 12
20021,309,562Not reported12 of 12
20031,207,467Not reported12 of 12
2004968,032Not reported12 of 12
2005803,442Not reported12 of 12
2006763,299Not reported12 of 12
20071,001,793Not reported12 of 12
20081,055,642Not reported12 of 12
2009958,255Not reported12 of 12
2010879,04515.7%12 of 12
2011553,5519.9%12 of 12
2012306,0695.5%12 of 12
2013268,1314.8%12 of 12
201443,7319.5%1 of 12
2015−1,389Not reported1 of 12
2016402,1877.3%12 of 12
2017326,1366.0%12 of 12
2018550,19610.1%12 of 12
2019742,86013.6%12 of 12
2020647,10911.8%12 of 12
2021662,01812.1%12 of 12
2022851,48315.6%12 of 12
20231,195,71121.9%12 of 12
20241,043,14819.1%12 of 12
2025826,68115.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

529,720

US short tons. 2024: 676,420

SO₂, 2025

3

US short tons

NOx, 2025

595

US short tons

CO₂ per MWh, calculated

0.64 t

About 1,282 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 3601 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

148,824

million gallons

Consumption, 2024

0

million gallons

Source

Lake Bastrop

Surface, Fresh. Once-through with cooling pond

Watershed stress

High · 0.732

USGS SUI, HUC12 Spicer Creek-Piney Creek

36 of 36 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine136.0May 1965
2Natural Gas Steam Turbine136.0March 1968
3Natural Gas Steam Turbine351.0May 1972

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lower Colorado River Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sim Gideon and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sim Gideon

More plants operated by Lower Colorado River Authority

Questions about Sim Gideon

How much power does Sim Gideon produce?

Sim Gideon reported 826,681 MWh (827 GWh) of net generation in 2025, a 15.1% capacity factor on 623 MW of nameplate capacity.

Where is Sim Gideon?

Sim Gideon is in Bastrop County, Texas, at 30.1456, −97.2708. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Sim Gideon?

EIA-860M for August 2026 lists Lower Colorado River Authority as the operator (EIA operator ID 11269). The operator is not always the owner.

When did Sim Gideon start operating?

Its first generator began operating in May 1965, according to EIA-860M.

Does InfraMap have power prices for Sim Gideon?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 3 price nodes linked to Sim Gideon, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page