Natural gasOperatingERCOT

Timmerman Power Plant

Natural gas power plant in Caldwell County, Texas. 368 MW of nameplate capacity across 20 generators, operated by Lower Colorado River Authority.

Also known as EIA plant 66335

Analyst: free account, 1 question a day.

Hays Energy ProjectBuda BESSMesquite Creek LFGTE ProjectCachiDunlap TP 1Rio Nogales Power ProjectTimmerman20 km
Open in the map
6 plants within 35 km, from EIA coordinates.

Key facts

Capacity
368 MWNameplate
Generators
20 operatingEIA-860M, August 2026
Operating since
August 2025First generator online
Operator
Lower Colorado River AuthorityEIA operator ID 11269
Grid
ERCOTBalancing authority ERCO
Price nodes
4 ERCOT nodesResource nodes with prices
Location
Caldwell County, TX29.8750, −97.8070
EIA plant ID
66335EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Timmerman produces

Free · EIA-923

Net generation, 2025

208 GWh

207,892 MWh, final. 5 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
2025207,892Not reported5 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
G1Natural Gas Internal Combustion Engine18.0August 2025
G2Natural Gas Internal Combustion Engine18.0August 2025
G3Natural Gas Internal Combustion Engine18.0August 2025
G4Natural Gas Internal Combustion Engine18.0August 2025
G5Natural Gas Internal Combustion Engine18.0August 2025
G6Natural Gas Internal Combustion Engine18.0August 2025
G7Natural Gas Internal Combustion Engine18.0August 2025
G8Natural Gas Internal Combustion Engine18.0August 2025
G9Natural Gas Internal Combustion Engine18.0August 2025
G10Natural Gas Internal Combustion Engine18.0August 2025
G11Natural Gas Internal Combustion Engine18.8April 2026
G12Natural Gas Internal Combustion Engine18.8April 2026
G13Natural Gas Internal Combustion Engine18.8April 2026
G14Natural Gas Internal Combustion Engine18.8April 2026
G15Natural Gas Internal Combustion Engine18.8April 2026
G16Natural Gas Internal Combustion Engine18.8April 2026
G17Natural Gas Internal Combustion Engine18.8April 2026
G18Natural Gas Internal Combustion Engine18.8April 2026
G19Natural Gas Internal Combustion Engine18.8April 2026
G20Natural Gas Internal Combustion Engine18.8April 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lower Colorado River Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Timmerman Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Timmerman

More plants operated by Lower Colorado River Authority

Questions about Timmerman

How much power does Timmerman Power Plant produce?

Timmerman Power Plant reported 207,892 MWh (208 GWh) of net generation in 2025. 5 of 12 months were reported for 2025.

Where is Timmerman Power Plant?

Timmerman Power Plant is in Caldwell County, Texas, at 29.8750, −97.8070. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Timmerman Power Plant?

EIA-860M for August 2026 lists Lower Colorado River Authority as the operator (EIA operator ID 11269). The operator is not always the owner.

When did Timmerman Power Plant start operating?

Its first generator began operating in August 2025, according to EIA-860M.

Does InfraMap have power prices for Timmerman Power Plant?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 4 price nodes linked to Timmerman Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page