Golden Triangle

Solar and battery storage project in Lowndes County, Mississippi. 250 MW of nameplate capacity across 2 generators, operated by Origis Energy USA, Inc.

Also known as Golden Triangle I · EIA plant 64529

This project groups Golden Triangle (EIA 64529). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

GCF US Holdings LLC Columbus MillOptimistCaledoniaGolden Triangle25 km
Open in the map
6 plants within 55 km, from EIA coordinates.

Key facts

Capacity
250 MWSolar 200.0 · Battery storage 50.0
Generators
2 operatingEIA-860M, August 2026
Operating since
January 2025First generator online
Operator
Origis Energy USA, IncEIA operator ID 58764
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Lowndes County, MS33.4189, −88.6189
EIA plant ID
64529EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Golden Triangle produces

Free · EIA-923

Net generation, 2025

412 GWh

411,833 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

280 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
2025411,833Not reported12 of 12
2026 (provisional, partial year)279,88727.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MS5_SBatteries50.0January 2025
OEMS5Solar Photovoltaic200.0January 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Origis Energy USA, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Golden Triangle and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Golden Triangle

More plants operated by Origis Energy USA, Inc

Questions about Golden Triangle

How much power does Golden Triangle produce?

Golden Triangle reported 411,833 MWh (412 GWh) of net generation in 2025. From January to July 2026 it reported 280 GWh, which is provisional.

Where is Golden Triangle?

Golden Triangle is in Lowndes County, Mississippi, at 33.4189, −88.6189. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Golden Triangle?

EIA-860M for August 2026 lists Origis Energy USA, Inc as the operator (EIA operator ID 58764). The operator is not always the owner.

Is Golden Triangle a solar or a battery storage plant?

Both. Solar capacity totals 200 MW and battery storage capacity totals 50 MW.

When did Golden Triangle start operating?

Its first generator began operating in January 2025, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page