Swift Air Solar I
Solar power plant in Ector County, Texas. 145 MW of nameplate capacity across 1 generator, operated by Origis Energy USA, Inc.
Also known as EIA plant 68537
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 145 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2025First generator online
- Operator
- Origis Energy USA, IncEIA operator ID 58764
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Ector County, TX31.7688, −102.6960
- EIA plant ID
- 68537EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Swift Air Solar I produces
Free · EIA-923Net generation, 2025
312 GWh
311,507 MWh, final. 9 of 12 months reported
Capacity factor, 2025
Not reported
2024: Not reported
January to July 2026
217 GWh
Provisional
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | Not reported | Not reported | 0 of 12 |
| 2025 | 311,507 | Not reported | 9 of 12 |
| 2026 (provisional, partial year) | 217,428 | 29.5% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| OSAS1 | Solar Photovoltaic | 145.0 | April 2025 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Origis Energy USA, Inc as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Swift Air Solar I and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Swift Air Solar I
More plants operated by Origis Energy USA, Inc
Questions about Swift Air Solar I
How much power does Swift Air Solar I produce?
Swift Air Solar I reported 311,507 MWh (312 GWh) of net generation in 2025. From January to July 2026 it reported 217 GWh, which is provisional. 9 of 12 months were reported for 2025.
Where is Swift Air Solar I?
Swift Air Solar I is in Ector County, Texas, at 31.7688, −102.6960. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Swift Air Solar I?
EIA-860M for August 2026 lists Origis Energy USA, Inc as the operator (EIA operator ID 58764). The operator is not always the owner.
When did Swift Air Solar I start operating?
Its first generator began operating in April 2025, according to EIA-860M.
Does InfraMap have power prices for Swift Air Solar I?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Swift Air Solar I, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page