SolarBattery storageOperatingTVA

Optimist

Solar and battery storage project in Clay County, Mississippi. 250 MW of nameplate capacity across 2 generators, operated by Origis Energy USA, Inc.

Also known as EIA plant 68536

This project groups Optimist (EIA 68536). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Golden TriangleGolden Triangle IIMississippi State UniversityCaledoniaGCF US Holdings LLC Columbus MillOptimist20 km
Open in the map
5 plants within 34 km, from EIA coordinates.

Key facts

Capacity
250 MWSolar 200.0 · Battery storage 50.0
Generators
2 operatingEIA-860M, August 2026
Operating since
January 2026First generator online
Operator
Origis Energy USA, IncEIA operator ID 58764
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Clay County, MS33.6435, −88.5940
EIA plant ID
68536EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Optimist produces

Free · EIA-923

Net generation, 2025

Not reported

Not reported MWh, final. 0 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

297 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
2025Not reportedNot reported0 of 12
2026 (provisional, partial year)297,388Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MS7_SBatteries50.0January 2026
OEMS7Solar Photovoltaic200.0January 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Origis Energy USA, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Optimist and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Optimist

More plants operated by Origis Energy USA, Inc

Questions about Optimist

Where is Optimist?

Optimist is in Clay County, Mississippi, at 33.6435, −88.5940. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Optimist?

EIA-860M for August 2026 lists Origis Energy USA, Inc as the operator (EIA operator ID 58764). The operator is not always the owner.

Is Optimist a solar or a battery storage plant?

Both. Solar capacity totals 200 MW and battery storage capacity totals 50 MW.

When did Optimist start operating?

Its first generator began operating in January 2026, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page