SolarBattery storageOperatingISO-NE

Blodgett Solar CSG

Solar and battery storage project in Middlesex County, Massachusetts. 10 MW of nameplate capacity across 2 generators, operated by Blodgett Street Solar 1, LLC.

Also known as Blodgett Solar (CSG) · EIA plant 64627

This project groups Blodgett Solar CSG (EIA 64627). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Westford Solar ParkBWC Stony Brook, LLC HybridNashua PlantMine Falls Generating StationBlodgett Solar CSG5 km
Open in the map
6 plants within 9.3 km, from EIA coordinates.

Key facts

Capacity
10 MWSolar 5.0 · Battery storage 5.0
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2021First generator online
Operator
Blodgett Street Solar 1, LLCEIA operator ID 64241
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Middlesex County, MA42.6789, −71.4451
EIA plant ID
64627EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Blodgett Solar CSG produces

Free · EIA-923

Net generation, 2025

9.32 GWh

9,317 MWh, final

Capacity factor, 2025

21.4%

2024: 22.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2022 to 2025

9.1–9.8

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
20212Not reported5 of 12
20229,75222.3%12 of 12
20239,14621.6%12 of 12
20249,84522.6%12 of 12
20259,31721.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BLDSolar Photovoltaic5.0August 2021
BLOBatteries5.0August 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Blodgett Street Solar 1, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Blodgett Solar CSG and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Blodgett Solar CSG

Questions about Blodgett Solar CSG

How much power does Blodgett Solar CSG produce?

Blodgett Solar CSG reported 9,317 MWh (9.32 GWh) of net generation in 2025, a 21.4% capacity factor on 10 MW of nameplate capacity.

Where is Blodgett Solar CSG?

Blodgett Solar CSG is in Middlesex County, Massachusetts, at 42.6789, −71.4451. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Blodgett Solar CSG?

EIA-860M for August 2026 lists Blodgett Street Solar 1, LLC as the operator (EIA operator ID 64241). The operator is not always the owner.

Is Blodgett Solar CSG a solar or a battery storage plant?

Both. Solar capacity totals 5 MW and battery storage capacity totals 5 MW.

When did Blodgett Solar CSG start operating?

Its first generator began operating in August 2021, according to EIA-860M.

Does InfraMap have power prices for Blodgett Solar CSG?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Blodgett Solar CSG, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page