SolarOperatingMISO

Novel Bo Hu 1 Solar (CSG)

Solar power plant in Rice County, Minnesota. 1 MW of nameplate capacity across 1 generator, operated by Novel Bo Hu 1 Solar LLC.

Also known as EIA plant 65006

Analyst: free account, 1 question a day.

Dundas Solar Holdings LLC CSGCarleton CollegeUSS Hubers Solar LLC CSGNovel Bo Hu 1 Solar (CSG)2 km
Open in the map
6 plants within 5.2 km, from EIA coordinates.

Key facts

Capacity
1 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2026First generator online
Operator
Novel Bo Hu 1 Solar LLCEIA operator ID 64433
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Rice County, MN44.4155, −93.1544
EIA plant ID
65006EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Novel Bo Hu 1 Solar (CSG) produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BOHU1Solar Photovoltaic1.0January 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Novel Bo Hu 1 Solar LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Novel Bo Hu 1 Solar (CSG) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Novel Bo Hu 1 Solar (CSG)

Questions about Novel Bo Hu 1 Solar (CSG)

Where is Novel Bo Hu 1 Solar (CSG)?

Novel Bo Hu 1 Solar (CSG) is in Rice County, Minnesota, at 44.4155, −93.1544. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Novel Bo Hu 1 Solar (CSG)?

EIA-860M for August 2026 lists Novel Bo Hu 1 Solar LLC as the operator (EIA operator ID 64433). The operator is not always the owner.

When did Novel Bo Hu 1 Solar (CSG) start operating?

Its first generator began operating in January 2026, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page