SolarOperatingPJM

Salt City Solar Project - Hybrid

Solar power plant in Ross County, Ohio. 49.9 MW of nameplate capacity across 1 generator, operated by Salt City Solar LLC.

Also known as EIA plant 65302

Analyst: free account, 1 question a day.

Pixelle Specialty Sol…Yellowbud Solar, LLCPickaway SolarBuckeye SolarFayette SolarSalt City Solar Proje…20 km
Open in the map
6 plants within 38 km, from EIA coordinates.

Key facts

Capacity
49.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 2023First generator online
Operator
Salt City Solar LLCEIA operator ID 64607
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Ross County, OH39.4147, −82.9629
EIA plant ID
65302EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Salt City Solar Project - Hybrid produces

Free · EIA-923

Net generation, 2025

104 GWh

103,713 MWh, final

Capacity factor, 2025

23.7%

2024: 23.6%

January to July 2026

65.2 GWh

Provisional

Range, 2024 to 2025

103.5–103.7

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
202331,408Not reported8 of 12
2024103,53123.6%12 of 12
2025103,71323.7%12 of 12
2026 (provisional, partial year)65,23125.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SOLARSolar Photovoltaic49.9May 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Salt City Solar LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Salt City Solar Project - Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Salt City Solar Project - Hybrid

Questions about Salt City Solar Project - Hybrid

How much power does Salt City Solar Project - Hybrid produce?

Salt City Solar Project - Hybrid reported 103,713 MWh (104 GWh) of net generation in 2025, a 23.7% capacity factor on 49.9 MW of nameplate capacity. From January to July 2026 it reported 65.2 GWh, which is provisional.

Where is Salt City Solar Project - Hybrid?

Salt City Solar Project - Hybrid is in Ross County, Ohio, at 39.4147, −82.9629. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Salt City Solar Project - Hybrid?

EIA-860M for August 2026 lists Salt City Solar LLC as the operator (EIA operator ID 64607). The operator is not always the owner.

When did Salt City Solar Project - Hybrid start operating?

Its first generator began operating in May 2023, according to EIA-860M.

Does InfraMap have power prices for Salt City Solar Project - Hybrid?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Salt City Solar Project - Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page