SolarBattery storageOperatingCAISO

Gilead Foster City Solar Project

Solar and battery storage project in San Mateo County, California. 1.6 MW of nameplate capacity across 3 generators, operated by Gilead Sciences Inc. Foster City.

Also known as EIA plant 65409

This project groups Gilead Foster City Solar Project (EIA 65409). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Franklin Templeton San MateoSilicon Valley Clean WaterAT&T - Redwood CityAmeresco Ox MountainCity of Hayward WWTPShelter Creek Condominiums SolarGilead Foster City So…5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
1.6 MWSolar 1.1 · Battery storage 0.5
Generators
3 operatingEIA-860M, August 2026
Operating since
April 2021First generator online
Operator
Gilead Sciences Inc. Foster CityEIA operator ID 64755
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
San Mateo County, CA37.5686, −122.2780
EIA plant ID
65409EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gilead Foster City Solar Project produces

Free · EIA-923

Net generation, 2025

1.89 GWh

1,890 MWh, final

Capacity factor, 2025

20.0%

2024: 20.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2022 to 2025

1.5–1.9

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
20211,407Not reported9 of 12
20221,85919.3%12 of 12
20231,47815.7%12 of 12
20241,94220.5%12 of 12
20251,89020.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GFCS1Solar Photovoltaic0.9April 2021
GFCS2Solar Photovoltaic0.2April 2021
GFCSBBatteries0.5April 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Gilead Sciences Inc. Foster City as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gilead Foster City Solar Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gilead Foster City Solar Project

Questions about Gilead Foster City Solar Project

How much power does Gilead Foster City Solar Project produce?

Gilead Foster City Solar Project reported 1,890 MWh (1.89 GWh) of net generation in 2025, a 20.0% capacity factor on 1.6 MW of nameplate capacity.

Where is Gilead Foster City Solar Project?

Gilead Foster City Solar Project is in San Mateo County, California, at 37.5686, −122.2780. It is in the California Independent System Operator balancing area (CISO).

Who operates Gilead Foster City Solar Project?

EIA-860M for August 2026 lists Gilead Sciences Inc. Foster City as the operator (EIA operator ID 64755). The operator is not always the owner.

Is Gilead Foster City Solar Project a solar or a battery storage plant?

Both. Solar capacity totals 1.1 MW and battery storage capacity totals 0.5 MW.

When did Gilead Foster City Solar Project start operating?

Its first generator began operating in April 2021, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page