Shasta College PH2 Solar Project
Solar and battery storage project in Shasta County, California. 2 MW of nameplate capacity across 2 generators, operated by TotalEnergies Distributed Generation, LLC.
Also known as EIA plant 65940
This project groups Shasta College PH2 Solar Project (EIA 65940). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 2 MWSolar 1.5 · Battery storage 0.5
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- January 2026First generator online
- Operator
- TotalEnergies Distributed Generation, LLCEIA operator ID 65112
- Grid
- CAISOBalancing authority CISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Shasta County, CA40.6252, −122.3140
- EIA plant ID
- 65940EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Shasta College PH2 Solar Project produces
Free · EIA-923Net generation, 2025
Not reported
Not reported MWh, final. 0 of 12 months reported
Capacity factor, 2025
Not reported
2024: Not reported
January to July 2026
Not reported
Provisional. 0 of 7 months reported
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 0 | Not reported | 12 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | Not reported | Not reported | 0 of 12 |
| 2025 | Not reported | Not reported | 0 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| SCSP1 | Solar Photovoltaic | 1.5 | January 2026 |
| SCSPB | Batteries | 0.5 | January 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists TotalEnergies Distributed Generation, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Shasta College PH2 Solar Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Shasta College PH2 Solar Project
Questions about Shasta College PH2 Solar Project
Where is Shasta College PH2 Solar Project?
Shasta College PH2 Solar Project is in Shasta County, California, at 40.6252, −122.3140. It is in the California Independent System Operator balancing area (CISO).
Who operates Shasta College PH2 Solar Project?
EIA-860M for August 2026 lists TotalEnergies Distributed Generation, LLC as the operator (EIA operator ID 65112). The operator is not always the owner.
Is Shasta College PH2 Solar Project a solar or a battery storage plant?
Both. Solar capacity totals 1.5 MW and battery storage capacity totals 0.5 MW.
When did Shasta College PH2 Solar Project start operating?
Its first generator began operating in January 2026, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page