Battery storageOperatingPJM

Bowling Green Energy Storage Project

Battery storage project in Wood County, Ohio. 12 MW of nameplate capacity across 1 generator, operated by VESI 21 LLC.

Also known as EIA plant 65951

Analyst: free account, 1 question a day.

Bowling Green PeakingDG AMP Solar Bowling GreenTroy Energy LLCIGS PCW1Maumee Solar10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
12 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 2023First generator online
Operator
VESI 21 LLCEIA operator ID 65129
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Wood County, OH41.3826, −83.6112
EIA plant ID
65951EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bowling Green Energy Storage Project produces

Free · EIA-923

Net generation, 2025

−2.28 GWh

−2,277 MWh, final

Battery discharge, 2025

22.8 GWh

Charge 25.1 GWh

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2024 to 2025

−2.6–−2.3

GWh a year. Low 2024, high 2025

Annual net generation, GWh
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024−2,591Not reported12 of 12
2025−2,277Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Battery plants can report negative net generation, when charging uses more energy than they discharge.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BG1Batteries12.0May 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists VESI 21 LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bowling Green Energy Storage Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bowling Green Energy Storage Project

Questions about Bowling Green Energy Storage Project

How much power does Bowling Green Energy Storage Project produce?

Bowling Green Energy Storage Project reported −2,277 MWh (−2.28 GWh) of net generation in 2025.

Where is Bowling Green Energy Storage Project?

Bowling Green Energy Storage Project is in Wood County, Ohio, at 41.3826, −83.6112. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Bowling Green Energy Storage Project?

EIA-860M for August 2026 lists VESI 21 LLC as the operator (EIA operator ID 65129). The operator is not always the owner.

When did Bowling Green Energy Storage Project start operating?

Its first generator began operating in May 2023, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page