Bowling Green Peaking

Natural gas power plant in Wood County, Ohio. 32 MW of nameplate capacity across 1 generator, operated by American Mun Power-Ohio, Inc.

Also known as EIA plant 7783

Analyst: free account, 1 question a day.

Bowling Green Energy…Troy Energy LLCIGS PCW1Maumee SolarBowling Green Peaking10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
32 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2000First generator online
Operator
American Mun Power-Ohio, IncEIA operator ID 40577
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Wood County, OH41.3884, −83.6402
EIA plant ID
7783EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bowling Green Peaking produces

Free · EIA-923

Net generation, 2025

2.26 GWh

2,262 MWh, final

Capacity factor, 2025

0.8%

2024: 0.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.0–3.6

GWh a year. Low 2022, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200314,939Not reported12 of 12
20041,155Not reported12 of 12
20051,565Not reported12 of 12
20061,686Not reported12 of 12
20071,660Not reported12 of 12
2008775Not reported12 of 12
2009138Not reported12 of 12
20101,0940.4%12 of 12
20112,3970.9%12 of 12
20123,5741.3%12 of 12
20132630.1%12 of 12
20148130.3%12 of 12
20151,1750.4%12 of 12
20162,7211.0%12 of 12
20172,1370.8%12 of 12
20183,5921.3%12 of 12
20191,3320.5%12 of 12
20202,1530.8%12 of 12
20212,2070.8%12 of 12
20229610.3%12 of 12
20231,5230.5%12 of 12
20242,3720.8%12 of 12
20252,2620.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1,829

US short tons. 2024: 2,050

SO₂, 2025

0

US short tons

NOx, 2025

2

US short tons

CO₂ per MWh, calculated

0.81 t

About 1,617 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (P001), matched to EIA plant 7783 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine32.0June 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists American Mun Power-Ohio, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bowling Green Peaking and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bowling Green Peaking

More plants operated by American Mun Power-Ohio, Inc

Questions about Bowling Green Peaking

How much power does Bowling Green Peaking produce?

Bowling Green Peaking reported 2,262 MWh (2.26 GWh) of net generation in 2025, a 0.8% capacity factor on 32 MW of nameplate capacity.

Where is Bowling Green Peaking?

Bowling Green Peaking is in Wood County, Ohio, at 41.3884, −83.6402. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Bowling Green Peaking?

EIA-860M for August 2026 lists American Mun Power-Ohio, Inc as the operator (EIA operator ID 40577). The operator is not always the owner.

When did Bowling Green Peaking start operating?

Its first generator began operating in June 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page