Fremont Energy Center

Natural gas power plant in Sandusky County, Ohio. 739.5 MW of nameplate capacity across 3 generators, operated by American Mun Power-Ohio, Inc.

Also known as Fremont Energy Center Power Plant · EIA plant 55701

Analyst: free account, 1 question a day.

Clyde Solar ArrayClyde Peaking EngineWoodville RTO BTMGenoa Diesel Generating StationDavis BesseFremont10 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
739.5 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
January 2012First generator online
Operator
American Mun Power-Ohio, IncEIA operator ID 40577
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
Sandusky County, OH41.3771, −83.1614
EIA plant ID
55701EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fremont produces

Free · EIA-923

Net generation, 2025

4.03 TWh

4,028,785 MWh, final

Capacity factor, 2025

62.2%

2024: 63.9%

January to July 2026

2.85 TWh

Provisional

Range, 2015 to 2025

2.7–4.2

TWh a year. Low 2016, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
20122,582,396Not reported12 of 12
20132,687,646Not reported12 of 12
20142,337,33936.1%12 of 12
20153,428,21952.9%12 of 12
20162,682,36041.3%12 of 12
20173,050,70447.1%12 of 12
20183,977,96461.4%12 of 12
20193,454,38853.3%12 of 12
20203,444,674Not reported12 of 12
20213,639,31456.2%12 of 12
20223,973,79661.3%12 of 12
20233,372,14652.1%12 of 12
20244,150,72563.9%12 of 12
20254,028,78562.2%12 of 12
2026 (provisional, partial year)2,849,28475.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

1.68M

US short tons. 2024: 1.73M

SO₂, 2025

8

US short tons

NOx, 2025

124

US short tons

CO₂ per MWh, calculated

0.42 t

About 832 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CT01, CT02), matched to EIA plant 55701 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

890

million gallons

Consumption, 2024

804

million gallons

Source

Municipal

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.170

USGS SUI, HUC12 Muskellunge Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CA01Natural Gas Fired Combined Cycle358.7January 2012
CT01Natural Gas Fired Combined Cycle190.4January 2012
CT02Natural Gas Fired Combined Cycle190.4January 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists American Mun Power-Ohio, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fremont Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fremont

More plants operated by American Mun Power-Ohio, Inc

Questions about Fremont

How much power does Fremont Energy Center produce?

Fremont Energy Center reported 4,028,785 MWh (4.03 TWh) of net generation in 2025, a 62.2% capacity factor on 739.5 MW of nameplate capacity. From January to July 2026 it reported 2.85 TWh, which is provisional.

Where is Fremont Energy Center?

Fremont Energy Center is in Sandusky County, Ohio, at 41.3771, −83.1614. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Fremont Energy Center?

EIA-860M for August 2026 lists American Mun Power-Ohio, Inc as the operator (EIA operator ID 40577). The operator is not always the owner.

When did Fremont Energy Center start operating?

Its first generator began operating in January 2012, according to EIA-860M.

Does InfraMap have power prices for Fremont Energy Center?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Fremont Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page